flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cornell shortlists six architectural firms for first building on tech campus

Cornell shortlists six architectural firms for first building on tech campus

Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.


By By BD+C Staff | March 1, 2012
The CornellNYC Tech campus, which will house the Technion-Cornell Innovation Ins
The CornellNYC Tech campus, which will house the Technion-Cornell Innovation Institute, will be a new type of academic enterpris

Cornell University announced a shortlist of six renowned architectural firms for the planned CornellNYC Tech campus’s core academic building on Roosevelt Island.

The six finalists were short-listed from a leading field of 43 international and national firms that were selected for their consistently exceptional portfolios of work relevant to the planned new building.

The finalists are:

  • Skidmore, Owings & Merrill (SOM)
  • OMA (Office for Metropolitan Architecture)
  • Diller Scofidio + Renfro
  • Morphosis Architects
  • Steven Holl Architects
  • Bohlin Cywinski Jackson

Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project. Cornell is planning to select and contract with one of the firms by this April.

In preparation for the design phase, Cornell is working with the SOM team that developed the successful tech campus proposal, to define an overall campus plan that will serve as the framework for all future new buildings and public spaces.

The planned new building will set the standard for the future development of the site.

Cornell’s plan is to make this first building “net zero,” meaning that the amount of energy its occupants use in one-year equals the amount produced on the island. Beyond the first core academic building, future projects for the campus include residences for faculty, staff and graduate students and corporate space that will be designed to achieve LEED Silver or higher certification.

The CornellNYC Tech campus, which will house the Technion-Cornell Innovation Institute, will be a new type of academic enterprise, with a focus on the intersection between academia and the private sector, that will fulfill New York Mayor Michael Bloomberg’s vision of transforming the city into a world hub of innovation and technology commercialization. BD+C

Related Stories

| Feb 21, 2014

Calatrava ordered to pay millions for 'shortcomings in his work' on conference center project

Famed architect Santiago Calatrava must pay 2.9 million euros due to faulty design work on the Palacio de Congresos project in Oviedo, Spain. 

| Feb 21, 2014

First look: Goettsch Partners reveals 'lighthouse' tower scheme for China resort

Topped with glowing beacon that will be visible for miles in any direction, the Rosewood Sanya tower is the centerpiece of a new resort and meeting complex on China’s Hainan Island.

| Feb 20, 2014

5 myths about cross laminated timber

A CLT expert clears up several common misconceptions and myths surrounding the use of wood as a building material.

Sponsored | | Feb 20, 2014

Chicago’s historic Wrigley Building renovated to attract tech companies

Purchased in 2011 by a consortium of investors led by BDT Capital Partners, the building’s new owners have recently renovated and reimagined the next life for this architectural landmark—as a hub for tech firms.

| Feb 20, 2014

World's longest desk? Massive, undulating desk accommodates 145 office workers [video]

The desk is built from plywood and one continuous sheet of resin, and can serve all 145 office employees at once. 

| Feb 19, 2014

It's a world record! Largest uninterrupted concrete pour kicks off Wilshire Grand project

Guinness World Records verifies the concrete pour as the largest ever

| Feb 19, 2014

Why you should start with a builder, part two

When it’s time to build or expand, the first step is finding a builder that fits your needs. Once you have found a builder, checked their references, visited with their previous clients and are ready to move forward, the next step is answering an initial set of questions that will direct your project.

| Feb 19, 2014

Slight rebound for Architecture Billings Index

After consecutive months of contracting demand for design services, AIA's Architecture Billings Index inched up nearly two points to 50.4 in January, indicating favorable business conditions.

| Feb 19, 2014

Sefaira Adds Daylighting Analysis to Performance Based Design Platform

Sefaira, the leader in software for high performance building design, today announced that its performance based design platform now includes daylighting analysis. With the addition of daylighting, Sefaira combines two critical design metrics in the same tool. 

| Feb 19, 2014

Harvard's 'termite robots' can build any thing, any way [video]

The robots build by observing thier environment and then obeying a set of traffic rules programmed by researchers.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021