flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cornell shortlists six architectural firms for first building on tech campus

Cornell shortlists six architectural firms for first building on tech campus

Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.


By By BD+C Staff | March 1, 2012
The CornellNYC Tech campus, which will house the Technion-Cornell Innovation Ins
The CornellNYC Tech campus, which will house the Technion-Cornell Innovation Institute, will be a new type of academic enterpris

Cornell University announced a shortlist of six renowned architectural firms for the planned CornellNYC Tech campus’s core academic building on Roosevelt Island.

The six finalists were short-listed from a leading field of 43 international and national firms that were selected for their consistently exceptional portfolios of work relevant to the planned new building.

The finalists are:

  • Skidmore, Owings & Merrill (SOM)
  • OMA (Office for Metropolitan Architecture)
  • Diller Scofidio + Renfro
  • Morphosis Architects
  • Steven Holl Architects
  • Bohlin Cywinski Jackson

Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project. Cornell is planning to select and contract with one of the firms by this April.

In preparation for the design phase, Cornell is working with the SOM team that developed the successful tech campus proposal, to define an overall campus plan that will serve as the framework for all future new buildings and public spaces.

The planned new building will set the standard for the future development of the site.

Cornell’s plan is to make this first building “net zero,” meaning that the amount of energy its occupants use in one-year equals the amount produced on the island. Beyond the first core academic building, future projects for the campus include residences for faculty, staff and graduate students and corporate space that will be designed to achieve LEED Silver or higher certification.

The CornellNYC Tech campus, which will house the Technion-Cornell Innovation Institute, will be a new type of academic enterprise, with a focus on the intersection between academia and the private sector, that will fulfill New York Mayor Michael Bloomberg’s vision of transforming the city into a world hub of innovation and technology commercialization. BD+C

Related Stories

Architects | Apr 26, 2022

Low-tech skills architects need to keep in a high-tech world

As architects continue to lean into learning and mastering the latest technologies, let us not forget the foundational, fundamental skills that are still expected by clients. RS&H National Design Director Philip Robbie explains.

Green | Apr 26, 2022

Climate justice is the design challenge of our lives

As climate change accelerates, poor nations and disadvantaged communities are suffering the first and worst impacts.

Multifamily Housing | Apr 26, 2022

Fitness centers for multifamily housing: Advice from 'Dr. Fitness,' Karl Smith

In this episode for HorizonTV, Cortland's Karl Smith shares best practices for designing, siting, and operating fitness centers in apartment communities.

Mixed-Use | Apr 26, 2022

Downtown Phoenix to get hundreds of residential and student housing units

In fast-growing Phoenix, Arizona, a transit-oriented development called Central Station will sit adjacent to Arizona State University’s Downtown Phoenix campus. 

Hotel Facilities | Apr 25, 2022

U.S. hotel construction pipeline up 2%, with 5,090 projects in the works

The total U.S. hotel construction pipeline stands at 5,090 projects and 606,302 rooms at the end of the first quarter of 2022, up 2% by projects, but down 3% by rooms, according to the Q1 2022 Construction Pipeline Trend Report for the United States from Lodging Econometrics (LE). 

Codes and Standards | Apr 25, 2022

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.

Sports and Recreational Facilities | Apr 25, 2022

Iowa's Field of Dreams to get boutique hotel, new baseball fields

A decade ago, Go the Distance Baseball formed to preserve the Iowa farm site where the 1989 movie Field of Dreams was filmed. 

Building Team | Apr 22, 2022

EarthCam Adds Senior Leadership Roles to Facilitate Rapid Growth

EarthCam today announced several new leadership positions as it scales up to accommodate increasing demand for its webcam technology and services.

Architects | Apr 22, 2022

Top 10 green building projects for 2022

The American Institute of Architects' Committee on the Environment (COTE) has announced its COTE Top Ten Awards for significant achievements in advancing climate action.

Mixed-Use | Apr 22, 2022

San Francisco replaces a waterfront parking lot with a new neighborhood

A parking lot on San Francisco’s waterfront is transforming into Mission Rock—a new neighborhood featuring rental units, offices, parks, open spaces, retail, and parking.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021