flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cornell College partners with Johnson Controls to improve campus energy efficiency

University Buildings

Cornell College partners with Johnson Controls to improve campus energy efficiency

The plan will reduce the college’s energy usage by 20%.


By David Malone, Associate Editor | July 14, 2020

Courtesy Cornell College

Cornell College in Mount Vernon, Iowa has partnered with Johnson Controls on a $5.9 million infrastructure improvement plan to rectify the campus’ aging infrastructure and significantly reduce operations and maintenance costs.

As part of the plan, the college’s original two buildings, College Hall (1857) and Old Sea (1853), have recently received over 150 new energy-efficient windows; high-efficiency boilers were installed to remove the final eight buildings from the campus steam plant; and nearly every campus building was upgraded with LED lighting.

The agreement with Johnson Controls guarantees that infrastructure upgrades will produce savings that repay the company for project costs over time, which does not require any traditional loans. Instead, Cornell pays Johnson Controls based on measured and verified results through a funding structure known as contingent payment funding. As a result, the infrastructure improvements do not impact any of the college’s existing debt covenants or obligations.

The campus is expected to reduce its energy usage by 20% thanks to the renovations.

Related Stories

University Buildings | Apr 26, 2017

UMass Amherst is home to America’s first CLT academic building

The building brings the architecture, landscape architecture, and building technology departments under one roof.

Sponsored | Ceilings | Apr 17, 2017

University of Toronto Scarborough Campus building meets aesthetic, performance and sustainability goals with Rockfon ceiling systems

The University of Toronto’s $52.5 million, 126,788-square-foot Environmental Science & Chemistry Building is the newest addition to the Scarborough campus in Toronto, Ontario, Canada.

Products and Materials | Mar 28, 2017

Mondopads highlight Portland State University’s new Decision Theater

A total of seven InFocus Mondopads were used in the room to accommodate large group work and individual study.

University Buildings | Mar 14, 2017

Fresh off NCAA national title, Clemson opens plush football operations complex

The 142,500-sf facility, which opened just three weeks after Clemson’s national championship win over the University of Alabama, adjoins the indoor practice facility and outdoor practice fields, consolidating football operations into one complex.

University Buildings | Mar 8, 2017

Massive mixed-use residential village on USC’s Los Angeles campus on schedule to open this fall

Prefabrication of the six buildings’ walls reduced construction time by a year. 

School Construction | Feb 26, 2017

A new survey finds education construction activity going strong this year

Surveys of school districts and colleges, though, raise questions about financing for future projects.  

University Buildings | Jan 10, 2017

UMass Amherst’s Isenberg School of Business to receive modern, twisted addition from BIG

The 70,000-sf building was developed in collaboration with Boston-based Goody Clancy.

University Buildings | Jan 9, 2017

Massive student housing project in Texas will be ready this Fall

Developers hope the early opening of some units sets the tone for the community and future rentals.

University Buildings | Dec 5, 2016

University of Chicago to open new education center in Hong Kong

The new facility will be named for University Trustee, Francis Yuen, and his wife Rose Wai Man Lee Yuen.

University Buildings | Nov 18, 2016

Stephen F. Austin State University’s new STEM building breaks ground

Kirksey Architecture designed the building that ‘will serve as a landmark for SFA.’

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021