The General Services Administration (GSA) has awarded Corgan Associates, Inc., and its design partner, Skidmore, Owings & Merrill LLP (SOM) the design of the new Social Security Administration (SSA) National Support Center (NSC) as part of the Hensel Phelps Design-Build team. Located in Northeast Maryland, the new 280,000-sf office and data center will replace the existing outdated National Computer Center and will house critical computer operations essential to providing prompt and accurate benefit payments to millions of Americans.
The new National Support Center anticipates future technological advancements that will promote the expansion and quality of services provided by the Social Security Administration. Upon completion, it will comply with Mission Critical Criteria from the Uptime Institute, including Tier 3 design certification standards and will provide the infrastructure necessary to support an estimated IT load of 10 megawatts.
The new SSA campus is expected to meet all Federal energy and water conservation goals while achieving LEED Gold Certification from the United States Green Building Council.
The Corgan/SOM design team will achieve energy efficiency through advanced building control systems, climatically responsive layouts, waste reduction principles, natural day-lighting, and solar control, both by building orientation and with solar control devices. Additional, high performance sustainable design permeates the new design with such elements as a six acre array of photovoltaic panels and the recapture of stormwater to assist with cooling and provide potable water throughout the facilities.
The mechanical engineering and plumbing design will be provided by KTA, Southland Mechanical, and MC Dean Electrical, civil engineering and landscape architecture by Timmons Group, and Thornton Tomasetti will provide the structural engineering design for the project. BD+C
Related Stories
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 13, 2012
China's high-speed building boom
A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.
| Mar 13, 2012
Commercial glazer Harmon expanding into Texas
Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.
| Mar 13, 2012
Worker office space to drop below 100-sf in five years
The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.
| Mar 12, 2012
Improving the performance of existing commercial buildings: the chemistry of sustainable construction
Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.
| Mar 9, 2012
2012 Giants 300 survey due Friday, April 13
See how your firm ranks among the AEC industry leaders.
| Mar 7, 2012
Firestone iPad app offers touch technology
Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.
| Mar 7, 2012
LEO A DALY opens new office in Riyadh, Saudi Arabia
Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.