flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Copenhagen Zoo and BIG unveil yin yang-shaped panda habitat

Green

Copenhagen Zoo and BIG unveil yin yang-shaped panda habitat

The new habitat will sit between two existing buildings, including the Elephant House designed by Norman Foster.


By David Malone, Associate Editor | March 29, 2017

Rendering courtesy of BIG

In preparation for its newest guests, Copenhagen Zoo enlisted the help of Bjarke Ingels Group, Schønherr Landscape Architects, and MOE to create a welcoming habitat.

The guests in question are two pandas from Chengdu, China being sent to Denmark as a gesture of goodwill from the Chinese government after the Queen of Denmark’s visit in 2014.

The Panda House will encompass a 1,250-sm indoor site and a 1,200-sm outdoor area and sit between two existing buildings, including the Elephant House designed by Norman Foster. The habitat will take on a circular shape and is designed to make the humans feel like the visitors rather than the other way around.

The new habitat consists of two levels. On the ground floor, panda access to the interior spaces is connected by a ramp. For visitors, all interior functions on the ground floor are designed to have the landscape at eye-level in order to immerse them in the natural landscape. A restaurant will be located on the ground floor, as well, between the new Panda House and the Elephant House. Guests will be able to eat while viewing both animals simultaneously.

 

Rendering courtesy of BIG.

 

For the pandas, the upper level leads to a walk along a rocky slope through native Nordic plants and into a dense bamboo forest. In addition to the bamboo forest, the enclosure also provides a “mist forest”. The pandas will be able to move between these forests according to temperature and season.

Both ends of the habitat, which from above looks like a large yin yang symbol, are raised to allow direct views of the pandas. The building is also designed to give visitors unique insight into the work of the zookeepers.

“The habitat is formed like a giant yin and yang symbol, two halves: the male and the female, complete each other to form a single circular whole,” says Bjarke Ingels in a press release. “The curvy lines are undulating in section to create the necessary separation between him and her - as well as between them and us.”

Construction is scheduled to begin later in 2017 after the $21.5 million construction budget has been secured.

 

Rendering courtesy of BIG.

 

Rendering courtesy of BIG.

Related Stories

Green | Sep 29, 2016

Building Design+Construction brings GreenZone Community Education Center to Greenbuild 2016

The structure will be donated to Compton YouthBuild for construction-training program.

Sustainability | Sep 29, 2016

Gloucester Cathedral to install commercial sized solar PV system on its roof

Mypower will install 150 solar panels on the roof, making it the oldest cathedral in the UK, and possible the world, with this type of solar power system.

Green | Sep 28, 2016

Green Business Certification Inc. announces 2016 LEED Fellows

LEED Fellows are best-in-class for green building design, engineering and development.

Sports and Recreational Facilities | Sep 26, 2016

Mercedes-Benz Stadium in Atlanta will be the NFL’s first LEED Platinum stadium

The Atlanta Falcons new home is expected to save 40% in energy usage than a typical NFL stadium.

Sustainability | Sep 22, 2016

Is ‘Growroom’ a glimpse into the future of urban agriculture?

Growroom’s spherical shape means it can also double as a covered outdoor public space.

Sustainability | Sep 19, 2016

Brussels’ Botanic Center apartment block looks to live up to its name with the addition of 10,000 plants and a rooftop “Chrysalis”

The project, which has been commissioned and is in the design phase, would eliminate CO2 and produce its own energy.

Energy | Sep 13, 2016

Oberlin College to hold conference on post-fossil fuel economy

The gathering will address climate change and new sources of energy.

BIM and Information Technology | Sep 7, 2016

Energy Star Portfolio Manager tool updated to factor in waste management

The costs and benefits of managing 29 types of waste are now included.

Sustainability | Aug 30, 2016

New federal project plans must include climate impacts

Agencies must quantify the specific impacts when possible.

Sponsored | Coatings | Aug 29, 2016

Making a greener future with biorenewable coatings

 Biorenewable and recycled materials help eliminate waste and reduce the use of virgin materials

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021