Clark Construction Group, one of the country’s largest building and civic construction firms, reportedly has been sold to over a dozen of its long-time owners and executives.
The Washington Post reports that the new owners of Bethesda, Md.-based Clark, who will now control 100% of the business, include its Chairman Dan T. Montgomery, its Director Peter C. Forster, and its President and CEO Robert D. Moser Jr. Clark Construction, which generates more than $4 billion in annual revenue, has 4,000 employees in 11 offices in the U.S.
Terms of this agreement were not disclosed. A call to Clark’s spokesperson, Susan Ross, was not returned by presstime.
What precipitated this transition of ownership was the death from congestive heart failure of the 87-year-old A. James Clark in March 2015. His Clark Enterprises owned a majority stake in Clark Construction. The sale of Clark Construction was announced on January 14, but apparently had been consummated several weeks earlier.
Clark Enterprises, a diversified private investment management firm, will now be separate from Clark Construction, which dates back to 1906, and whose iconic projects have included Verizon Center, Nationals Park, and FedEx Field in Washington D.C., along with the Ronald Reagan Building in Los Angeles and an addition to Lincoln Center for the Performing Arts in New York City.
According to the company’s history, the present-day Clark Construction Group evolved from its biggest subsidiary, The George Hyman Construction Company. A. James Clark, who had been an employee of Hyman since 1950, took over the business in the 1960s and established Clark Construction in 1982.
Clark Construction’s expertise extends to design-build, lean and pre-construction, public-private partnerships, and virtual design and construction. Its 23 market sectors include offices, aviation, sports and entertainment, mission critical, hospitality, government, education, and multifamily.
Among its recent projects is a joint venture with Horizon on the $100 million, 250,000-sf Joint Processing Center in Houston that is expected to establish a new level of correctional processing for that city. The building will include temporary holding cells, medical facilities and cells, arraignment courtrooms, short-term inmate housing, and operations for the County Sheriff and City Police departments.
Clark is building the 43-story, 872,000-sf Park Tower at Transbay in San Francisco, a JV of The John Buck Company, Golub and Company, and Metlife, and designed by Goettsch Partners. And Clark is engaged with architect Fentress Architects in a $500 million renovation of 500,000 sf of exhibit and interior spaces at the Miami Convention Center, a project that includes an addition of a 60,000-sf ballroom with meeting and pre-function space.
Related Stories
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
| Oct 13, 2010
Hospital and clinic join for better patient care
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.
| Oct 13, 2010
Biloxi’s convention center bigger, better after Katrina
The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.
| Oct 13, 2010
Tower commemorates Lewis & Clark’s historic expedition
The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.