flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Contractors should scrutinize contracts carefully amid Covid-19 crisis

Codes and Standards

Contractors should scrutinize contracts carefully amid Covid-19 crisis

Compliance with time-sensitive notice requirements and careful documentation required.


By Peter Fabris, Contributing Editor | March 23, 2020

Courtesy Pixabay

During the Covid-19 virus crisis, it is important for contractors to protect themselves from possible legal action by adhering to the provisions of current contracts, lawyers advise.

“The virus and its economic impact will almost alter pre-existing plans for owners, developers, general contractors, subcontractors, and everyone else down the chain,” according to Balch & Bingham LLP. “While many are understanding of these circumstances, there are ways to ensure you are protected going forward.” They advise:

· Review on-going contracts and locate their delay, force majeure, change order, termination, suspension and other relevant provisions.

· Comply with time-sensitive notice requirements. This includes supply agreements and insurance policies. When there is uncertainty over whether to invoke a provision in a document, consider putting the other party on notice to protect your rights.

· Scrupulously document developments. “Proving delays, labor shortages, supply interruption, and other project impacts tomorrow will depend on the evidence being created (or not being created) today.” Simple email or daily notes are acceptable to record the impacts from COVID-19.

· Check your insurance coverage. Business interruption insurance typically includes complex provisions and exclusions.

· Anticipate operational problems. “Administrative tasks might be easily completed from home while supply chains may be severely limited by a reduced and quarantined workforce thousands of miles away.” Anticipate likely problems and try to plan for them.

Related Stories

Codes and Standards | Oct 4, 2021

Boston City Council approves mandate for major emissions cuts for large buildings

Applies to buildings 20,000 sf or larger—about 4% of city’s buildings.

Codes and Standards | Oct 4, 2021

HPD Collaborative and Green Seal to align standards

Will result in expanded options for manufacturers to enhance sustainability reporting and certifications.

Codes and Standards | Sep 30, 2021

U.S. has a deficit of 5 million homes

Builders unable to keep pace with demand.

Codes and Standards | Sep 29, 2021

Mass Timber group study will compare structural round timber to glulam products and steel

Will compare costs, capabilities, and carbon impacts of structural materials.

Codes and Standards | Sep 28, 2021

Massachusetts creates Commission on Clean Heat

First-of-its kind body to set targets for buildings to reduce emissions from heating fuels.

Codes and Standards | Sep 27, 2021

Commercial real estate industry faces SEC climate disclosure regulations

Risks associated with climate change would have to be revealed.

Codes and Standards | Sep 22, 2021

Group proposes Carbon Use Intensity metric for new buildings

Plan would track embedded carbon on projects.

Codes and Standards | Sep 22, 2021

Cities need to step up flood mitigation efforts to save lives

Recent storms highlight climate change dangers.

Codes and Standards | Sep 21, 2021

Steps to improve ventilation for Covid can combat colds and flu

New look at airborne disease spread shows time viruses linger in air may have been underestimated.

boombox1
boombox2
native1

More In Category


Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021