flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Contractors should scrutinize contracts carefully amid Covid-19 crisis

Codes and Standards

Contractors should scrutinize contracts carefully amid Covid-19 crisis

Compliance with time-sensitive notice requirements and careful documentation required.


By Peter Fabris, Contributing Editor | March 23, 2020

Courtesy Pixabay

During the Covid-19 virus crisis, it is important for contractors to protect themselves from possible legal action by adhering to the provisions of current contracts, lawyers advise.

“The virus and its economic impact will almost alter pre-existing plans for owners, developers, general contractors, subcontractors, and everyone else down the chain,” according to Balch & Bingham LLP. “While many are understanding of these circumstances, there are ways to ensure you are protected going forward.” They advise:

· Review on-going contracts and locate their delay, force majeure, change order, termination, suspension and other relevant provisions.

· Comply with time-sensitive notice requirements. This includes supply agreements and insurance policies. When there is uncertainty over whether to invoke a provision in a document, consider putting the other party on notice to protect your rights.

· Scrupulously document developments. “Proving delays, labor shortages, supply interruption, and other project impacts tomorrow will depend on the evidence being created (or not being created) today.” Simple email or daily notes are acceptable to record the impacts from COVID-19.

· Check your insurance coverage. Business interruption insurance typically includes complex provisions and exclusions.

· Anticipate operational problems. “Administrative tasks might be easily completed from home while supply chains may be severely limited by a reduced and quarantined workforce thousands of miles away.” Anticipate likely problems and try to plan for them.

Related Stories

Codes and Standards | Jan 25, 2022

Modeling tool helps compare options for HVAC systems when little known about a building

Compares projected costs and energy usage for all HVAC systems and hot water consumption.

Codes and Standards | Jan 25, 2022

Critics slam proposed revamp of California’s solar net energy metering rate

Could make rooftop solar panels unaffordable for most customers.

Sponsored | Resiliency | Jan 24, 2022

Norshield Products Fortify Critical NYC Infrastructure

New York City has two very large buildings dedicated to answering the 911 calls of its five boroughs. With more than 11 million emergency calls annually, it makes perfect sense. The second of these buildings, the Public Safety Answering Center II (PSAC II) is located on a nine-acre parcel of land in the Bronx. It’s an imposing 450,000 square-foot structure—a 240-foot-wide by 240-foot-tall cube. The gleaming aluminum cube risesthe equivalent of 24 stories from behind a grassy berm, projecting the unlikely impression that it might actually be floating. Like most visually striking structures, the building has drawn as much scorn as it has admiration. 

Codes and Standards | Jan 24, 2022

N.Y. governor calls for ban on natural gas in new buildings

Action follows New York City’s ban.

Codes and Standards | Jan 19, 2022

EPA may expand product lineup that can earn WaterSense label

Would include systems that enhance water quality at the tap.

Codes and Standards | Jan 19, 2022

Canada’s Trudeau seeking building codes changes, net-zero emissions building strategy

Prime minister also wants net-zero electricity grid by 2035.

Codes and Standards | Jan 18, 2022

Greater emphasis on building materials needed to achieve net-zero carbon offices

Engineered wood, straw, and bamboo can be keys to achieving goal.

Codes and Standards | Jan 17, 2022

AISC seeks comments on draft earthquake standard for steel buildings

Includes new limits for cross-sectional slenderness of steel columns based on latest research.

Codes and Standards | Jan 12, 2022

California’s wildfire building code significantly reduces structural loss

As other states consider upgrading their codes, Golden State provides useful model.

boombox1
boombox2
native1

More In Category


Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021