During the Covid-19 virus crisis, it is important for contractors to protect themselves from possible legal action by adhering to the provisions of current contracts, lawyers advise.
“The virus and its economic impact will almost alter pre-existing plans for owners, developers, general contractors, subcontractors, and everyone else down the chain,” according to Balch & Bingham LLP. “While many are understanding of these circumstances, there are ways to ensure you are protected going forward.” They advise:
· Review on-going contracts and locate their delay, force majeure, change order, termination, suspension and other relevant provisions.
· Comply with time-sensitive notice requirements. This includes supply agreements and insurance policies. When there is uncertainty over whether to invoke a provision in a document, consider putting the other party on notice to protect your rights.
· Scrupulously document developments. “Proving delays, labor shortages, supply interruption, and other project impacts tomorrow will depend on the evidence being created (or not being created) today.” Simple email or daily notes are acceptable to record the impacts from COVID-19.
· Check your insurance coverage. Business interruption insurance typically includes complex provisions and exclusions.
· Anticipate operational problems. “Administrative tasks might be easily completed from home while supply chains may be severely limited by a reduced and quarantined workforce thousands of miles away.” Anticipate likely problems and try to plan for them.
Related Stories
Codes and Standards | Apr 4, 2017
Global standards for indoor environmental monitoring under development
Systems and sensors guidelines will be aligned with major green standards.
Codes and Standards | Apr 3, 2017
New standard test method for static loading and impact on exterior shading released
The method provides a standard lab procedure evaluation of ice and snow loads and impacts.
Codes and Standards | Mar 30, 2017
WELL enters strategic partnership with developer of standards and assessment tools
GIGA’s RESET standard and data collection will be integrated into the WELL standard.
Codes and Standards | Mar 29, 2017
Climate-specific code changes target energy savings for tropical zones
Hawaii considers updated 2015 IECC tailored to its climate.
Codes and Standards | Mar 28, 2017
Safety concerns over wood-frame construction raised after Raleigh apartment fire
The unfinished building was destroyed in a five-alarm blaze.
Codes and Standards | Mar 27, 2017
Bills in Maryland Legislature would restrict use of wood in multifamily construction
American Wood Council and design and construction professionals are speaking out against the measure.
Codes and Standards | Mar 23, 2017
New manual of IT connectivity guidelines for commercial developments, redevelopments released
Mobile capacity planning, conduit points of entry, and electrical resiliency are covered.
Codes and Standards | Mar 22, 2017
Brick Industry Assn. study finds brick buildings cost less than precast, metal, and glass
The study compares costs in five categories of construction.
Codes and Standards | Mar 21, 2017
Calif. shopping center is first to earn BREEAM USA In-Use certification
The certification measures and monitors environmental performance of existing buildings.
Codes and Standards | Mar 20, 2017
Professional liability insurance rates for architects and engineers expected to be stable in 2017
Premiums leveled off in 2015, and claims have been stable, helping to hold costs down.