flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Contractors say 811 utility location system has significant flaws

Codes and Standards

Contractors say 811 utility location system has significant flaws

More than half of firms in survey report damages, near misses because lines were unmarked or marked incorrectly.


By Peter Fabris, Contributing Editor | November 22, 2021
Excavator

Courtesy Pixabay

The nation’s 811 utility location system is significantly flawed, according to a new survey of construction firms that perform underground excavation work.

The survey report, released by the Associated General Contractors of America, found that more than half of the responding firms reported damages and near misses because lines were unmarked or marked incorrectly. “Most contractors say that calling 811 often leads to inaccurate line marking and that utility firms are often very slow in coming out to locate and mark their underground lines,” according to an AGC news release.

Seventy-eight percent of firms who found weaknesses said the biggest problem is the lack of accurate utility locating by utility owners and operators. And 56% of firms with concerns about the 811 system said slow utility owner and operator response times are a significant weakness.

Many firms reported being unfairly blamed for damages even after contacting 811. The survey found that nearly two-thirds of contractors received a claim from a utility owner and operator for damage to a line the construction firm was not responsible for damaging.

“We need to fix the 811 system to make sure utility firms are doing their part to accurately mark their lines,” said Stephen E. Sandherr, AGC CEO. “Too few utility firms are being held accountable for doing their part when it comes to helping contractors avoid hitting underground lines.”
 

Related Stories

Codes and Standards | Jul 7, 2021

Intl. Code Council appoints committees to lead energy code development

One-third of appointees are government regulators.

Codes and Standards | Jul 1, 2021

COVID-19 made payment delays to contractors much worse

Only one in ten companies is always getting paid in full.

Codes and Standards | Jun 30, 2021

New resource for public sector organizations to develop energy data management program

Dept. of Energy document contains more than 30 examples of successful implementations.

Codes and Standards | Jun 29, 2021

Biden China policy may spur more increased U.S. PV manufacturing capacity

Senate bill proposes advanced solar manufacturing production credit.

Codes and Standards | Jun 28, 2021

Local and state building energy performance standards aim to curb climate change

Owners must up the ante on operations and retrofits.

Codes and Standards | Jun 24, 2021

Biden Administration will restore ‘Waters of the U.S.’ protections ended by Trump

Early revision more likely to hold up in court, says legal expert.

Codes and Standards | Jun 23, 2021

Denver unveils renewable heating and cooling plan

City releases roadmap to decarbonizing existing homes and buildings.

Codes and Standards | Jun 22, 2021

Actually, few companies plan to significantly reduce their office footprint

CBRE survey shows that many firms will continue with hybrid work.

Codes and Standards | Jun 21, 2021

Vancouver, B.C., may delay new zero emissions building standards

Building permit delays may postpone new standards by a year.

Codes and Standards | Jun 17, 2021

Buffalo’s parking reform having noticeable impact on development

Elimination of mandatory parking allotments encourages new projects.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021