flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Contractors say 811 utility location system has significant flaws

Codes and Standards

Contractors say 811 utility location system has significant flaws

More than half of firms in survey report damages, near misses because lines were unmarked or marked incorrectly.


By Peter Fabris, Contributing Editor | November 22, 2021
Excavator

Courtesy Pixabay

The nation’s 811 utility location system is significantly flawed, according to a new survey of construction firms that perform underground excavation work.

The survey report, released by the Associated General Contractors of America, found that more than half of the responding firms reported damages and near misses because lines were unmarked or marked incorrectly. “Most contractors say that calling 811 often leads to inaccurate line marking and that utility firms are often very slow in coming out to locate and mark their underground lines,” according to an AGC news release.

Seventy-eight percent of firms who found weaknesses said the biggest problem is the lack of accurate utility locating by utility owners and operators. And 56% of firms with concerns about the 811 system said slow utility owner and operator response times are a significant weakness.

Many firms reported being unfairly blamed for damages even after contacting 811. The survey found that nearly two-thirds of contractors received a claim from a utility owner and operator for damage to a line the construction firm was not responsible for damaging.

“We need to fix the 811 system to make sure utility firms are doing their part to accurately mark their lines,” said Stephen E. Sandherr, AGC CEO. “Too few utility firms are being held accountable for doing their part when it comes to helping contractors avoid hitting underground lines.”
 

Related Stories

Codes and Standards | Oct 9, 2015

New California law means commercial building benchmarking program will be implemented

Multifamily housing to be included, a first for a U.S. state.

Codes and Standards | Oct 2, 2015

New ASHRAE guideline for commissioning existing systems and assemblies

Focuses on optimum facility and system operation.

Codes and Standards | Sep 18, 2015

New RELi standard addresses disaster resilience

Based on LEED model, may help lower insurance rates  

Building Materials | Aug 28, 2015

Structural steel buildings specification available for second public review

Next year's specification open for comments until Sept. 21

Energy Efficiency | Aug 28, 2015

North American Passive House Network e-book explains Passivhaus, net-zero techniques

Free guide includes spotlight on individual projects

Windows and Doors | Aug 28, 2015

Newly formed group challenges Florida building code

Window, door companies oppose provisions that raise costs

Codes and Standards | Aug 28, 2015

New Orleans becoming a model for climate resilience only 10 years after Katrina

The city has moved ahead with resilience strategies that may become a model for other communities

Codes and Standards | Aug 21, 2015

Illinois governor vetoes bill that would restrict condo owners’ rights

Bill would have made it harder to sue for building flaws

Codes and Standards | Aug 21, 2015

Post-Katrina roofing codes creating more resilient buildings on Gulf Coast

Ten years after storm, notable progress on stronger roofs, IBHS says

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021