The nation’s 811 utility location system is significantly flawed, according to a new survey of construction firms that perform underground excavation work.
The survey report, released by the Associated General Contractors of America, found that more than half of the responding firms reported damages and near misses because lines were unmarked or marked incorrectly. “Most contractors say that calling 811 often leads to inaccurate line marking and that utility firms are often very slow in coming out to locate and mark their underground lines,” according to an AGC news release.
Seventy-eight percent of firms who found weaknesses said the biggest problem is the lack of accurate utility locating by utility owners and operators. And 56% of firms with concerns about the 811 system said slow utility owner and operator response times are a significant weakness.
Many firms reported being unfairly blamed for damages even after contacting 811. The survey found that nearly two-thirds of contractors received a claim from a utility owner and operator for damage to a line the construction firm was not responsible for damaging.
“We need to fix the 811 system to make sure utility firms are doing their part to accurately mark their lines,” said Stephen E. Sandherr, AGC CEO. “Too few utility firms are being held accountable for doing their part when it comes to helping contractors avoid hitting underground lines.”
Related Stories
Codes and Standards | Dec 14, 2016
Cities must invest $375 billion to avoid catastrophic global climate change
C40 Cities Climate Leadership Group advocates low carbon infrastructure.
Codes and Standards | Dec 14, 2016
Resilient construction techniques pay for themselves over lifetime of buildings
Spending $340,000 for resiliency would pay for itself over the lifetime of a $10 million structure.
Codes and Standards | Dec 12, 2016
Dept. of Energy launches program to advance zero energy school design
Six school districts and two states are among the first to mainstream zero energy schools.
Codes and Standards | Dec 9, 2016
California city’s plan for net zero building includes net zero water usage
Santa Monica city services building aims for highest level of sustainability.
Codes and Standards | Dec 8, 2016
WELL and BREEAM to align standards
The goal is to make it easier for projects pursuing both standards.
Codes and Standards | Dec 7, 2016
U.S. lumber industry pushes for import duties on Canadian softwood
The industry claims the product is being sold below fair market value.
Codes and Standards | Dec 5, 2016
International Construction Measurement Standards draft released
The goal is to improve consistency for calculating costs and reducing risk.
Codes and Standards | Dec 2, 2016
D.C. Council passes bill to reduce number of blighted properties
The new legislation reduces the amount of time a vacant property can qualify for a lower tax rate.
Codes and Standards | Dec 1, 2016
Passive House standard gaining influence in commercial sector
Some industry watchers predict it will become the base building code.
Codes and Standards | Nov 30, 2016
Researchers finding solutions to bird/building collisions
Glass facades pose a serious risk to birds and cause millions of avian deaths each year.