flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Contractors say 811 utility location system has significant flaws

Codes and Standards

Contractors say 811 utility location system has significant flaws

More than half of firms in survey report damages, near misses because lines were unmarked or marked incorrectly.


By Peter Fabris, Contributing Editor | November 22, 2021
Excavator

Courtesy Pixabay

The nation’s 811 utility location system is significantly flawed, according to a new survey of construction firms that perform underground excavation work.

The survey report, released by the Associated General Contractors of America, found that more than half of the responding firms reported damages and near misses because lines were unmarked or marked incorrectly. “Most contractors say that calling 811 often leads to inaccurate line marking and that utility firms are often very slow in coming out to locate and mark their underground lines,” according to an AGC news release.

Seventy-eight percent of firms who found weaknesses said the biggest problem is the lack of accurate utility locating by utility owners and operators. And 56% of firms with concerns about the 811 system said slow utility owner and operator response times are a significant weakness.

Many firms reported being unfairly blamed for damages even after contacting 811. The survey found that nearly two-thirds of contractors received a claim from a utility owner and operator for damage to a line the construction firm was not responsible for damaging.

“We need to fix the 811 system to make sure utility firms are doing their part to accurately mark their lines,” said Stephen E. Sandherr, AGC CEO. “Too few utility firms are being held accountable for doing their part when it comes to helping contractors avoid hitting underground lines.”
 

Related Stories

Codes and Standards | Feb 11, 2019

Investing in downtowns pays off for cities, regions

Benefits include driving tax revenue, business activity, and smart development.

Codes and Standards | Feb 8, 2019

Oslo, Norway’s downtown goes virtually car-free

Parking spots converted to bike lanes, transit is fast and easy.

Codes and Standards | Feb 7, 2019

New North Carolina energy code has extensive lighting control requirements

Includes automatic shut offs for buildings of all sizes.

Codes and Standards | Feb 6, 2019

Solar carports can help with California’s Title 24 mandates

Can be combined with virtual net-metering software and tax-enabled financing.

Codes and Standards | Feb 1, 2019

Mass. governor proposes real estate transfer fee hike for climate resiliency projects

Opposed by real estate and trade groups, plan could generate $1 billion in next decade.

Codes and Standards | Jan 31, 2019

New York City will reform construction bid process

Streamlined process intended to improve efficiency, reduce hassle for bidders.

Codes and Standards | Jan 30, 2019

New AGC program aims to diversify construction workforce

More diversity needed to keep pace with demand for workers.

Codes and Standards | Jan 29, 2019

Registration now open for LEED v4.1 for New Construction and Interior Spaces

Emphasizes human health and integrative building design.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021