flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Contractors can be liable for building failures many years after project completion

Codes and Standards

Contractors can be liable for building failures many years after project completion

Personal injury suits could be brought decades after substantial completion.


By Peter Fabris, Contributing Editor | August 5, 2021

Courtesy Pixabay

Implied and express warranties for construction or material defects on projects have time limits but when the time limit is exceeded, that doesn’t mean that contractors are completely free from liability for failures.

Warranties are usually limited to one to three years, and the statute of limitations on construction defects, while it varies by jurisdiction, is usually limited to 10 years. But personal injury law provides potential grounds for litigation many years later.

For example, in New York the statute of limitation on personal injury is three years from when an injury occurs. That means a lawsuit targeting a contractor could be brought decades after a building is completed.

Contractors can protect themselves from liability by performing their work in a diligent and professional manner, according to current codes, and not cut corners, lawyers advise. For example, don’t substitute a different class of rebar from what is called for in structural drawings even if you believe that choice would be best. Instead, raise the issue with the engineer or construction manager who can best address the issue.

Related Stories

Codes and Standards | Sep 17, 2019

Zero energy buildings can be constructed with no added upfront cost

ROI can be realized in as little as one year.

Codes and Standards | Sep 13, 2019

Researchers use U. of Arkansas buildings as testbed for CLT panels

Investigation could influence future use of the materials.

Codes and Standards | Sep 13, 2019

At least 30 U.S. cities have adopted stricter building energy codes since 2017

Some followed their states in implementing more robust standards.

Codes and Standards | Sep 12, 2019

Illinois law sets maximum retainage on private projects

The change is expected to give contractors bigger checks earlier in project timeline.

Codes and Standards | Sep 10, 2019

Retreat may be the best option for some coastal communities in face of sea level rise

A new study makes the case for relocating in a "strategic, managed" manner.

Codes and Standards | Sep 9, 2019

Free app calculates maximum allowable heights and areas for buildings

A free app that calculates the maximum allowable heights and areas for buildings of various occupancy classifications and types of construction has been released.

Codes and Standards | Sep 6, 2019

Standard for assessing frame deflection using one component polyurethane foams updated

The standard offers guidance when installing fenestration products.

Codes and Standards | Aug 29, 2019

The high cost of gridlock: $166 billion per year

Growing economy means more jobs, more cars, more hours stuck in traffic.

Codes and Standards | Aug 29, 2019

Industry leaders ask for government help as trades shortage worsens

AGC asks for more funding for education and increased immigration to fill gaps.

Codes and Standards | Aug 29, 2019

Code-conforming wood design guide available

The guide summarizes provisions for the use of wood and wood products in the 2018 IBC.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021