flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Contractors can be liable for building failures many years after project completion

Codes and Standards

Contractors can be liable for building failures many years after project completion

Personal injury suits could be brought decades after substantial completion.


By Peter Fabris, Contributing Editor | August 5, 2021

Courtesy Pixabay

Implied and express warranties for construction or material defects on projects have time limits but when the time limit is exceeded, that doesn’t mean that contractors are completely free from liability for failures.

Warranties are usually limited to one to three years, and the statute of limitations on construction defects, while it varies by jurisdiction, is usually limited to 10 years. But personal injury law provides potential grounds for litigation many years later.

For example, in New York the statute of limitation on personal injury is three years from when an injury occurs. That means a lawsuit targeting a contractor could be brought decades after a building is completed.

Contractors can protect themselves from liability by performing their work in a diligent and professional manner, according to current codes, and not cut corners, lawyers advise. For example, don’t substitute a different class of rebar from what is called for in structural drawings even if you believe that choice would be best. Instead, raise the issue with the engineer or construction manager who can best address the issue.

Related Stories

Codes and Standards | Aug 5, 2020

Designing, redeveloping communities for zero energy needed to address climate change

District heating and cooling systems boost efficiency.

Codes and Standards | Aug 4, 2020

Virginia is the first state to adopt COVID-19 worker safety rules

Include social distancing requirements, notifications when co-worker tests positive, timelines to return to work after recovery.

Codes and Standards | Aug 3, 2020

Report aids local governments on policy options, pathways to electrify new buildings

Document focuses on switching appliances and equipment away from natural gas, propane.

Codes and Standards | Jul 30, 2020

Institute for Market Transformation acquires Energy-Efficient Codes Coalition

Goal is to achieve net-zero construction by 2050.

Codes and Standards | Jul 29, 2020

Crackdowns grow on construction firms that fail to follow COVID-19 guidelines

States, cities, and OSHA enforce social distancing, hand-washing regulations.

Codes and Standards | Jul 28, 2020

California utility adopts climate emergency declaration

Sacramento-region company commits to working towards carbon neutrality by 2030.

Codes and Standards | Jul 23, 2020

North Carolina will stop relying on FEMA flood mapping

State will identify flood zones on its own.

Codes and Standards | Jul 22, 2020

New version of IAPMO’s Water Demand Calculator is available

Enhanced features include selection between single- and multifamily buildings.

Codes and Standards | Jul 22, 2020

Mobile app calculates sound transmission for wood-framed assemblies

American Wood Council tool for floor-ceiling assemblies.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021