Implied and express warranties for construction or material defects on projects have time limits but when the time limit is exceeded, that doesn’t mean that contractors are completely free from liability for failures.
Warranties are usually limited to one to three years, and the statute of limitations on construction defects, while it varies by jurisdiction, is usually limited to 10 years. But personal injury law provides potential grounds for litigation many years later.
For example, in New York the statute of limitation on personal injury is three years from when an injury occurs. That means a lawsuit targeting a contractor could be brought decades after a building is completed.
Contractors can protect themselves from liability by performing their work in a diligent and professional manner, according to current codes, and not cut corners, lawyers advise. For example, don’t substitute a different class of rebar from what is called for in structural drawings even if you believe that choice would be best. Instead, raise the issue with the engineer or construction manager who can best address the issue.
Related Stories
Codes and Standards | Sep 5, 2018
New White Paper on Metal Panel Fire Safety Released
Has detailed information for insulation, fire safety requirements in U.S., other countries.
Codes and Standards | Aug 31, 2018
Trade war could make adaptive reuse more attractive
Higher cost of building materials could make rehab a better financial bet.
Codes and Standards | Aug 30, 2018
Metrics should guide strategy for schools seeking LEED certification
Assessing current status helps direct where improvements can have greatest impact.
Codes and Standards | Aug 29, 2018
The 2018 IAPMO solar and swimming pool codes now available
For installation and inspection of public and private swimming pools, spas, and hot tubs.
Codes and Standards | Aug 28, 2018
New York’s green roof program needs reform
Despite incentives, few owners add vegetative roofs.
Codes and Standards | Aug 24, 2018
Resilience, sustainability emphasized in plans for new 23,000-acre city in the Philippines
“A backup for when Manila fails.”
Codes and Standards | Aug 23, 2018
Cities promote deconstruction of old homes with mixed results
Market factors complicate efforts to recycle material from old structures.
Codes and Standards | Aug 22, 2018
Oregon is first state to change building code to allow tall mass timber buildings
Statewide alternate method allows early technical consideration and approval.
Codes and Standards | Aug 21, 2018
First mass timber panel made from structural composite lumber gets APA certification
Said to be much more cost effective than CLT options.
Codes and Standards | Aug 17, 2018
Zoning changes can be crucial to filling large, empty retail spaces
Alternative uses often require action by local officials.