To succeed in the coming decades, construction workers will need continuous skills upgrades, according to a report by the Autodesk Foundation and Monitor Institute by Deloitte.
The research outlines a comprehensive framework for examining the skills gap challenge and specific opportunity areas for investment. “We need to understand the effects of technology adoption, how to mitigate the risks, and how to ensure that long-term incentives for success are aligned for all parties,” according to a news release.
The report highlights four key points about how to address the skills gap in U.S. construction and manufacturing:
— Training workers for new technical skills is important, but these skills can quickly become obsolete if they are not explicitly tied to more foundational and transferable capabilities
— The accelerating pace of technological change necessitates workers engage in continuous “skills upgrades,” requiring workers to imagine – and navigate – very different career pathways
— Continuous learning requires shortening the metaphorical distance between learning and work, which is most effective when learning is embedded into work and work into learning
— Closing the skills gap requires addressing a broader set of challenges facing workers: in the marketplace for jobs, at work, and in policies and practices that affect the broader “social determinants of work”
Related Stories
| Mar 15, 2012
ANSI approves new fall protection standards
The American National Standards Institute (ANSI) has approved two American Society of Safety Engineers' (ASSE) standards addressing fall protection.
| Mar 8, 2012
Engineering innovation provides new option for meeting seismic codes in skyscrapers
Two University of Toronto engineers have developed “viscoelastic-energy-dissipating dampers” to replace many of the heavy concrete beams used in tall structures.
| Mar 8, 2012
CSI webinar on building code compliance March 22
A March 22 webinar will provide an overview of a 28-step process during the design of a building to ensure compliance with building codes.
| Mar 8, 2012
Federal silica dust rule caught in bureaucratic limbo
A federal rule meant to protect the lungs of workers has been caught in bureaucratic purgatory for more than a year.
| Mar 8, 2012
New LEED-EBOM rating has requirements for specific project types
Several key changes are proposed for the LEED-EBOM Rating System in 2012.
| Mar 8, 2012
Green buildings more resilient than conventionally built structures
A new study by the U.S. Green Building Council (USGBC) and the University of Michigan’s Taubman College of Architecture and Urban Planning suggests that structures built to green standards can advance building resiliency.
| Mar 1, 2012
LEED Platinum standard likely to mean net-zero energy by 2018
As LEED standards continue to rise, the top level, LEED Platinum, will likely mean net-zero energy construction by 2018.
| Mar 1, 2012
EPA beefs up stormwater discharge rule from construction projects
The U.S. Environmental Protection Agency (EPA) has now finalized its 2012 construction general permit (CGP) that authorizes stormwater discharges from construction projects that disturb one or more acres of land in the areas where EPA is the permitting authority.