flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction team named for Atlanta Braves ballpark

Construction team named for Atlanta Braves ballpark

The ballpark is scheduled to open in early 2017.


By American Builders 2017 | June 4, 2014
The Cobb County Board of Commissioners voted to approve American Builders 2017 as the construction manager at risk (construction manager) to oversee the construction of the new Atlanta Braves ballpark, which is scheduled to open in early 2017.
 
American Builders 2017 is a joint venture between Brasfield & Gorrie, Mortenson Construction, Barton Malow Company and New South Construction. Combined, they have more than 225 years of construction experience and have completed more than 330 sports projects, including Target Field in Minneapolis, Coors Field in Denver and Oriole Park at Camden Yards in Baltimore. In addition, the building and design team will include Populous as the stadium architect, JLL as the project manager, JERDE as the master land planner and Van Wagner Sports and Entertainment as the partnership consultant.
 
“We are thrilled the Cobb County Commission has taken this large, and final, step that will allow this project to move forward. These agreements are the framework that will ensure a successful partnership between our organization and Cobb County,” said Braves Executive Vice President Mike Plant.  “Our team has worked side-by-side with the staff in Cobb County to ensure that we have the right partner in place to deliver the world-class venue that we all expect to see here on opening day of 2017. American Builders 2017 expertise in ballpark construction, ties to the local community and assurances of delivering the ballpark within budget gave us all the confidence to entrust them with this project.”
 
"Building the new home of the Atlanta Braves—such an iconic project located in the heart of our hometown—is really a dream for our team," American Builders 2017 Principal-in-Charge Rob Taylor said. "We formed American Builders so we could draw on the resources, experience and expertise we have, both locally and nationally, and be able to deliver this project successfully for the Braves and Cobb County. We are confident in the ability to meet the schedule and look forward to the first pitch in the new ballpark in 2017."
 
Proposed renderings of the new stadium can be viewed at www.HomeoftheBraves.com. Construction is scheduled to begin in the second half of 2014.
 
Check out the ballpark renderings below.
 
 
 
 
 
 

Related Stories

Architects | Mar 25, 2021

The Weekly Show, March 25, 2021: The Just Label for AEC firms, and Perkins Eastman's Well-Platinum design studio

This week on The Weekly show, BD+C editors speak with AEC industry leaders about the Just Label from the International Living Future Institute, and the features and amenities at Perkins Eastman's Well Platinum-certified design studio.

Architects | Mar 23, 2021

Design firms KTGY, Simeone Deary Design Group unite to shape future of architectural design through experiential environments

With a bold vision to reshape how people experience spaces, residential design firm joins forces with interior design group, creating fully integrated architecture, branding, interiors and planning practice.

Architects | Mar 15, 2021

A life in architecture – Lessons from my father

A veteran designer looks back on the lessons his father, a contractor, taught him.

Architects | Mar 11, 2021

Calling all building design professionals: BD+C needs your expertise on design innovation in 2021

This new BD+C research project explores the leading drivers, sources of inspiration, and successful outcomes for design innovation projects and initiatives.  

Coronavirus | Mar 11, 2021

The Weekly show, March 11, 2021: 5 building products for COVID-related conditions, and AI for MEP design

This week on The Weekly show, BD+C editors speak with AEC industry leaders about building products and systems that support COVID-related conditions, and an AI tool that automates the design of MEP systems.

Laboratories | Mar 10, 2021

8 tips for converting office space to life sciences labs

Creating a successful life sciences facility within the shell of a former office building can be much like that old “square peg round hole” paradigm. Two experts offer important advice.

AEC Tech | Mar 4, 2021

The Weekly show, March 4, 2021: Bringing AI to the masses, and Central Station Memphis hotel

This week on The Weekly show, BD+C editors speak with AEC industry leaders about the award-winning Central Station Memphis hotel reconstruction project, and how Autodesk aims to bring generative design and AI tools to the AEC masses.

Architects | Mar 1, 2021

OMA designs 7-mile-long underwater sculpture park

The project will be completed in several phases.

Architects | Mar 1, 2021

AIA elevates 102 members to the College of Fellows

AIA fellowship recognizes significant contributions to the profession of architecture and society.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021