A joint venture consisting of Mace and consultant EC Harris will oversee the construction of Kingdom Tower: a 1,000-meter project proposed as the tallest building in the world. Saudi firm Binladen Group will build the skyscraper, which will be three to four times as tall as London's Shard, another Mace/Harris project. An interdisciplinary team led by Adrian Smith + Gordon Gill Architecture designed the 500,000-square-meter project, which will combine a luxury hotel, apartments, office space, and an observatory.
The Harris/Mace joint venture incorporates the tall-buildings expertise of EC Harris and RISE, a sister firm within ARCADIS, and Mace, an international company. Together the firms have delivered more than 100 tall buildings worldwide. Construction is projected to begin later this year and take more than five years.
The tower is planned as the centerpiece of the Kingdom City development, a project of the Jeddah Economic Company. The design for the urban project will include residential, commercial, hotel, offices, retail, educational, and commercial properties.
(http://www.echarris.com/reference/news/kingdom_tower.aspx)
(Gizmodo image via Construction Enquirer)
Related Stories
| Apr 7, 2014
40 Under 40 winners: Meet the architects
Of the up-and-coming AEC professionals to be named 40 Under 40 winners by the editors of Building Design+Construction, 21 make their living in the architecture profession.
| Apr 4, 2014
$25 million Orion Jet Center designed by SchenkelShultz now open
As the centerpiece of the 45-acre campus, which is its first phase of a planned 215-acre mixed-use development, the 18,000 square foot executive terminal facility offers spacious passenger areas, administrative space, an executive suite, rental car kiosk, catering and a cafe.
| Apr 3, 2014
Security, accountability, and cloud access: Can you really have it all?
I’ve heard countless stories of conversations between project engineers and IT professionals who can’t come to an agreement on the level of security needed to protect their data while making it more accessible—not only externally, but also internally.
| Apr 2, 2014
The new model of healthcare facility management
A growing number of healthcare organizations are moving to an integrated real estate model in an effort to better manage costs, respond to regulatory requirements, and support changes in patient care delivery.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Apr 2, 2014
Check out the stunning research facility just named 2014 Lab of the Year [slideshow]
NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards.
| Apr 1, 2014
The risks of mismatched fire-rated assemblies
Mismatched fire-rated glass and framing happens more often than you think. Failing to confirm that the tested and listed performance capabilities of the framing system match those of the glazing can create a financial nightmare for the entire building team.
| Apr 1, 2014
Planned global commerce center breaks ground near Phoenix
When completed, PhoenixMart will be one of the largest single-level trade centers in the U.S.
| Apr 1, 2014
Paints, coatings and sealants: Choosing products and procedures for best performance
This course covers life cycle assessment, color selection, emissions, durability, resilience, corrosion resistance, specification standards, and other critical aspects of choosing coatings for interior and exterior walls, ceilings, and roofs.
| Mar 31, 2014
Extreme conversion: Soaring Canadian church transformed into contemporary library
Even before the St. Denys-du-Plateau Church was converted into a library, it was an unusual building, with a towering nave designed to mimic a huge tent inflated by the wind.