flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction problems at prison spur support to quash non-traditional project delivery in Iowa

Codes and Standards

Construction problems at prison spur support to quash non-traditional project delivery in Iowa

Legislators may remove exceptions to design-bid-build.


By Peter Fabris, Contributing Editor | March 5, 2015
Construction problems at prison spur support to quash non-traditional project delivery in Iowa

The state university system would be one of the entities most impacted by changes to state law on project delivery. Photo: via Pixabay

Iowa lawmakers are investigating construction problems at the Fort Madison prison project and are scrutinizing rules regarding project delivery on state projects, according to a Des Moines Register report.

The prison will require $25 million to fix geothermal heating and ventilation systems. Legislators are pointing fault at the construction management arrangement that had private construction managers overseeing the project. 

In 2011, Iowa’s Department of Administrative Services eliminated the requirement for traditional design-bid-build and laid off state staff who had overseen construction projects. In the wake of sharp public scrutiny of the prison project, there is growing bi-partisan support to return project delivery rules to design-bid-build. Bills have been introduced in the state House and Senate to do just that.

The state university system would be one of the entities most impacted by changes to state law on project delivery.

Related Stories

Codes and Standards | May 8, 2018

Powerhouse coalition builds energy positive buildings

The goal: build buildings that provide more power than they cost to build, run, and demolish.

Codes and Standards | May 7, 2018

Plan advances in Los Angeles for Climate Emergency Mobilization Department

Would oversee efforts to reduce greenhouse gas emissions across the city.

Codes and Standards | May 3, 2018

Data collection, machine learning boost building efficiency

Sensors, software algorithms squeeze out waste.

Codes and Standards | May 1, 2018

ASHRAE publishes new energy simulation-aided design standard

Requires building energy modeling during schematic design.

Codes and Standards | Apr 30, 2018

CALGreen projects pre-approved for streamlined LEED v4 requirements

Reduces need to run additional energy models.

Codes and Standards | Apr 26, 2018

New standard supports community resilience

ASTM International guidance supports cost-effective ways to withstand and recover from disasters.

Codes and Standards | Apr 25, 2018

Lessons learned from decades of Superfund cleanups guide contaminated land reuse

Sites repurposed for residential, commercial use, and solar energy generation.

Codes and Standards | Apr 24, 2018

Vibrant downtown core the key for urban multifamily development

Nighttime activity makes the difference.

Codes and Standards | Apr 19, 2018

ILFI launches new Zero Carbon Certification

Offers greater flexibility around project fuel types and offsetting renewables.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021