flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction problems at prison spur support to quash non-traditional project delivery in Iowa

Codes and Standards

Construction problems at prison spur support to quash non-traditional project delivery in Iowa

Legislators may remove exceptions to design-bid-build.


By Peter Fabris, Contributing Editor | March 5, 2015
Construction problems at prison spur support to quash non-traditional project delivery in Iowa

The state university system would be one of the entities most impacted by changes to state law on project delivery. Photo: via Pixabay

Iowa lawmakers are investigating construction problems at the Fort Madison prison project and are scrutinizing rules regarding project delivery on state projects, according to a Des Moines Register report.

The prison will require $25 million to fix geothermal heating and ventilation systems. Legislators are pointing fault at the construction management arrangement that had private construction managers overseeing the project. 

In 2011, Iowa’s Department of Administrative Services eliminated the requirement for traditional design-bid-build and laid off state staff who had overseen construction projects. In the wake of sharp public scrutiny of the prison project, there is growing bi-partisan support to return project delivery rules to design-bid-build. Bills have been introduced in the state House and Senate to do just that.

The state university system would be one of the entities most impacted by changes to state law on project delivery.

Related Stories

Codes and Standards | Oct 11, 2018

On-site staff key to energy benchmarking project for property management company

Manager training, data sharing are critical to meeting 20% utility cost reduction goal.

Codes and Standards | Oct 10, 2018

Interactive heat maps track temperature ranges in U.S. cities

Urban heat island effect can vary by as much as 37°F in the same city.

Codes and Standards | Oct 9, 2018

Power systems will become more decentralized for better disaster resiliency

Businesses, homeowners will control more power-generation capacity.

Codes and Standards | Oct 5, 2018

Getting commitments from key subs critical on government contracts

Withdrawn subcontractor bids can be costly.

Codes and Standards | Oct 4, 2018

Internal watchdog says EPA falling short to protect school children from asbestos

Agency not conducting enough inspections, report says.

Codes and Standards | Oct 3, 2018

Climate change impacts could prompt realignment of assets for commercial property developers

Strategies include reducing exposure to properties in flood-prone areas.

Codes and Standards | Oct 2, 2018

Political will, tougher standards needed to reach carbon neutral goal

Stretch codes, more stringent credentials for designers, contractors, and inspectors may be needed.

Codes and Standards | Sep 27, 2018

Natural light is the most prized office perk

Employees crave sunshine and views of the outdoors more than cafeterias, fitness centers, and childcare.

Codes and Standards | Sep 26, 2018

Industry consensus needed for multifamily energy efficiency retrofit approach

Choice of insulating materials can impact indoor air quality, resident health.

Codes and Standards | Sep 25, 2018

New market forces disrupting global real estate development industry

Executives concerned about trade policy, labor shortages, approval processes.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â