Minneapolis achieved a construction milestone in 2014, when for the first time it issued $2 billion in new building permits in a single year.
The Star Tribune reports that two major projects—a new stadium for the Minnesota Vikings NFL team and the city’s Downtown East redevelopment—accounted for about half of the total worth of the permits issued. About one third of the total permits issued were for more than 2,000 housing units, the vast majority of which will be multifamily dwellings.
More than 65% of the new permits were issued for projects in Minneapolis’s Ward 3, which encompasses the North Loop, Downtown East, the downtown riverfront, and northeast Minneapolis.
Doug Kress, the city’s director of development services, told the Star Tribune that the stadium project has sparked development in the surrounding areas. “There’s a lot of growth in Minneapolis in both downtown and our neighborhoods,” he’s quoted as saying. (Minneapolis ranks 16th as a metropolitan region in population in the U.S., with 3.42 million residents.)
This metro is looking for permit growth to continue in 2015. The Star Tribune reports that at least 10 projects around the city have received land-use approval. And portions of the Vikings stadium and Downtown East projects have yet to be permitted.
Mayor Betsy Hodges believes the permitting activity is evidence of a vote of confidence that investors, workers, business owners, and residents are giving to the city’s future. “I look forward to building on this momentum as we continue to attract new residences, businesses, and investment,” she told the Star Tribune.
Related Stories
| Nov 6, 2012
Simpson Strong-Tie donates $25K to hurricane support
The company will also be matching employees’ personal contributions to the Red Cross and other nonprofit disaster relief organizations.
| Nov 6, 2012
Goettsch Partners designs new tower in Shunde, China
200-meter-tall building will be located between Guangzhou and Hong Kong.
| Nov 5, 2012
Brasfield & Gorrie awarded new steel processing facility for Kloeckner Metals
The construction will take place on a 16-acre greenfield site at ThyssenKrupp Industrial Park in Calvert.
| Nov 5, 2012
Trimble acquires Vico assets, extends design-build-operate capabilities
Software to add 5D management to Trimble’s Solutions for vertical construction contractors.
| Oct 30, 2012
Lord, Aeck & Sargent announces four student life facility wins
Projects recognize the architecture firm’s expertise on a nationwide basis.
| Oct 30, 2012
The Beck Group announces CEO succession plan
Current Eastern Division Director and company veteran, Fred Perpall, named CEO.
| Oct 30, 2012
Two-hour fire rated curtain wall passes CDC tests
CDC (Curtain Wall Design and Consulting) is an independent firm providing a wide range of building envelope design, engineering, and consulting services to design professionals nationwide.
| Oct 30, 2012
Wight & Company announces three hires
Expands team and adds staff to work on the UNO project.
| Oct 15, 2012
Silicones from Dow Corning solve high-altitude technical challenges at the world’s tallest tower
The spectacular Burj Khalifa skyscraper soars to 828m above ground level, holding the record for being the world’s tallest building and also for the highest installation of an aluminum and glass façade. To take on its numerous challenges and technical difficulties, it required proven silicone solutions and full support from Dow Corning.
| Oct 15, 2012
Three new members elected to AISC Board of Directors
New members will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.