flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction on Orlando’s massive ‘innovation hub’ is finally starting

Mixed-Use

Construction on Orlando’s massive ‘innovation hub’ is finally starting

The $1 billion Creative Village development will create a business and education hub.


By John Caulfield, Senior Editor | May 10, 2015
Construction on Orlando’s massive ‘innovation hub’ is finally starting

This mixed-use project, which had been delayed for a number of years, is already being touted as mecca for business, colleges, and residents. Rendering courtesy Creative Village Development 

The 68-acre, $1 billion Creative Village project in downtown Orlando, the largest transit-oriented project in central Florida, is expected to break ground on May 14.

This mixed-use project, which had been delayed for a number of years, is already being touted as mecca for business, colleges, and residents. The Orlando Business Journal reports that the University of Central Florida has committed to anchor the Village with a $207 million downtown campus that would create 4,000 jobs. UCF has stated its intention to bring 6,000 students downtown.

Creative Village is a public/private partnership between the City of Orlando and the Master Developer, Creative Village Development; a joint venture between Banc of America Community Development Corporation, and a local developer-investment team lead by Ustler Development. Baker Barrios Architects, the project’s design architect; and Emerge Real Estate Ventures, are part of that group.

The city’s Amway Arena was demolished in 2012 to make way for Creative Village. That demolition’s debris—including 94 million pounds of concrete and 13 million pounds of steel—was recycled and/or sorted for future reuse to build Creative Village’s infrastructure.

The development expected to take 15 to 20 years to complete, and include when finished 1.2 million sf of office and creative space, 500,000 sf of education space, 1,500 housing units, and 225 hotel rooms. A PS-8 school is planned nearby. Construction will create 6,500 jobs, and the Village would offer 5,000 permanent jobs. The Building Team estimates that Creative Village would also generate between $800 million and $1 billion in new development.

Road and utility work in Phase 1 would accommodate the expansion of the Lynz Lymmo bus circulator system to Orlando’s west side, near the Parramore District. Craig Ustler, MAI, CCIM, president of Ustler Development, said that about $13 million in infrastructure work on the bus route and the building paths is already taking shape.

Vertical construction is scheduled to begin in later 2015 or early 2016.

Related Stories

| Apr 28, 2023

$1 billion mixed-use multifamily development will add 1,200 units to South Florida market

A giant $1 billion residential project, The District in Davie, will bring 1.6 million sf of new Class A residential apartments to the hot South Florida market. Located near Ft. Lauderdale and greater Miami, the development will include 36,000 sf of restaurants and retail space. The development will also provide 1.1 million sf of access controlled onsite parking with 2,650 parking spaces. 

Mixed-Use | Apr 27, 2023

New Jersey turns a brownfield site into Steel Tech, a 3.3-acre mixed-use development

In Jersey City, N.J., a 3.3-acre redevelopment project called Steel Tech will turn a brownfield site into a mixed-use residential high-rise building, a community center, two public plazas, and a business incubator facility. Steel Tech received site plan approval in recent weeks.

Green | Apr 21, 2023

Top 10 green building projects for 2023

The Harvard University Science and Engineering Complex in Boston and the Westwood Hills Nature Center in St. Louis are among the AIA COTE Top Ten Awards honorees for 2023. 

Urban Planning | Apr 17, 2023

The future of the 20-minute city

Gensler's Stacey Olson breaks down the pros and cons of the "20-minute city," from equity concerns to data-driven design.

Multifamily Housing | Apr 17, 2023

World's largest multifamily building pursuing ILFI Zero Carbon certification under construction in Washington, D.C.

The Douglass, in Washington, D.C.’s Ward 8, is currently the largest multifamily housing project to pursue Zero Carbon Certification from the International Living Future Institute (ILFI).

Urban Planning | Apr 12, 2023

Watch: Trends in urban design for 2023, with James Corner Field Operations

Isabel Castilla, a Principal Designer with the landscape architecture firm James Corner Field Operations, discusses recent changes in clients' priorities about urban design, with a focus on her firm's recent projects.

Market Data | Apr 11, 2023

Construction crane count reaches all-time high in Q1 2023

Toronto, Seattle, Los Angeles, and Denver top the list of U.S/Canadian cities with the greatest number of fixed cranes on construction sites, according to Rider Levett Bucknall's RLB Crane Index for North America for Q1 2023.

Contractors | Apr 10, 2023

What makes prefabrication work? Factors every construction project should consider

There are many factors requiring careful consideration when determining whether a project is a good fit for prefabrication. JE Dunn’s Brian Burkett breaks down the most important considerations. 

Mixed-Use | Apr 7, 2023

New Nashville mixed-use high-rise features curved, stepped massing and wellness focus

Construction recently started on 5 City Blvd, a new 15-story office and mixed-use building in Nashville, Tenn. Located on a uniquely shaped site, the 730,000-sf structure features curved, stepped massing and amenities with a focus on wellness.

Affordable Housing | Mar 14, 2023

3 affordable housing projects that overcame building obstacles

These three developments faced certain obstacles during their building processes—from surrounding noise suppression to construction methodology.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021