flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction on Orlando’s massive ‘innovation hub’ is finally starting

Mixed-Use

Construction on Orlando’s massive ‘innovation hub’ is finally starting

The $1 billion Creative Village development will create a business and education hub.


By John Caulfield, Senior Editor | May 10, 2015
Construction on Orlando’s massive ‘innovation hub’ is finally starting

This mixed-use project, which had been delayed for a number of years, is already being touted as mecca for business, colleges, and residents. Rendering courtesy Creative Village Development 

The 68-acre, $1 billion Creative Village project in downtown Orlando, the largest transit-oriented project in central Florida, is expected to break ground on May 14.

This mixed-use project, which had been delayed for a number of years, is already being touted as mecca for business, colleges, and residents. The Orlando Business Journal reports that the University of Central Florida has committed to anchor the Village with a $207 million downtown campus that would create 4,000 jobs. UCF has stated its intention to bring 6,000 students downtown.

Creative Village is a public/private partnership between the City of Orlando and the Master Developer, Creative Village Development; a joint venture between Banc of America Community Development Corporation, and a local developer-investment team lead by Ustler Development. Baker Barrios Architects, the project’s design architect; and Emerge Real Estate Ventures, are part of that group.

The city’s Amway Arena was demolished in 2012 to make way for Creative Village. That demolition’s debris—including 94 million pounds of concrete and 13 million pounds of steel—was recycled and/or sorted for future reuse to build Creative Village’s infrastructure.

The development expected to take 15 to 20 years to complete, and include when finished 1.2 million sf of office and creative space, 500,000 sf of education space, 1,500 housing units, and 225 hotel rooms. A PS-8 school is planned nearby. Construction will create 6,500 jobs, and the Village would offer 5,000 permanent jobs. The Building Team estimates that Creative Village would also generate between $800 million and $1 billion in new development.

Road and utility work in Phase 1 would accommodate the expansion of the Lynz Lymmo bus circulator system to Orlando’s west side, near the Parramore District. Craig Ustler, MAI, CCIM, president of Ustler Development, said that about $13 million in infrastructure work on the bus route and the building paths is already taking shape.

Vertical construction is scheduled to begin in later 2015 or early 2016.

Related Stories

| Jun 4, 2013

SOM research project examines viability of timber-framed skyscraper

In a report released today, Skidmore, Owings & Merrill discussed the results of the Timber Tower Research Project: an examination of whether a viable 400-ft, 42-story building could be created with timber framing. The structural type could reduce the carbon footprint of tall buildings by up to 75%.

| Apr 30, 2013

First look: North America's tallest wooden building

The Wood Innovation Design Center (WIDC), Prince George, British Columbia, will exhibit wood as a sustainable building material widely availablearound the globe, and aims to improve the local lumber economy while standing as a testament to new construction possibilities.

| Mar 3, 2013

Hines acquires Archstone's interest in $700 million CityCenterDC project

The Washington D.C. office of Hines, the international real estate firm, announced the acquisition of the ownership interest of their partner, Archstone, in the mixed-use CityCenterDC project that is currently under construction in downtown Washington, D.C.

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

| Jul 12, 2012

EE&K and Knutson Construction selected for the Interchange in Minneapolis

Design-build contract for $79.3 million transportation hub will connect transit with culture.

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021