flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction materials prices rise for first time in six months

Contractors

Construction materials prices rise for first time in six months

On a year-over-year basis, construction input prices fell 3.9%.


By Associated Builders and Contractors | March 13, 2015
Construction materials prices rise for first time in six months

"This rise is the first monthly gain since April 2014 and the eighth consecutive month in which petroleum prices were down on a year-over-year basis." said Associated Builders and Contractors Chief Economist Anirban Basu. Photo: Tosirog via Wikimedia Commons

The largest monthly gain in petroleum prices in over three years caused construction materials prices to expand 0.4 percent in February, ending a six-month streak when prices failed to rise, according to the March 13 producer price index release by the Bureau of Labor Statistics. On a year-over-year basis, construction input prices fell 3.9%. Nonresidential construction input prices also rose 0.4% on a monthly basis and were down 4.9% on a yearly basis.

"While conventional wisdom suggests that oil and natural gas prices will eventually rise, the adjustment period could be a lengthy one and although crude petroleum prices were up 12.3% on a monthly basis, this is likely a function of an abnormally cold February," said Associated Builders and Contractors Chief Economist Anirban Basu. "This rise is the first monthly gain since April 2014 and the eighth consecutive month in which petroleum prices were down on a year-over-year basis.

"For now, inventories of fuel remain elevated and most believe that the U.S. dollar's upward movement is not at an end," said Basu. "This, in addition to the quantitative easing that has begun in Europe and the potential for increasing interest rates in America, means that there is likely to be greater demand for U.S. fixed income assets, which will serve to further strengthen the U.S. dollar and put downward pressure on certain key construction input prices. This dynamic was widely apparent in February, during which prices for seven of the 11 key construction inputs failed to rise and no input other than crude petroleum increased in excess of one percent."

 

 

The following materials prices increased in February:

  • Nonferrous wire and cable prices grew 0.8% on a monthly basis but fell 4.4% on a yearly basis
  • Crude petroleum prices gained 12.3% in February but are down 53.4% from the same time last year.
  • Crude energy materials prices expanded 0.9% in February but are 45% lower year-over-year.
  • Concrete products prices expanded 0.2% in February and are up 4.3% on a yearly basis.

Seven of the 11 key construction inputs did not expand for the month:

  • Prices for plumbing fixtures fell 0.1% in February but are up 3.0% on a year-over-year basis.
  • Fabricated structural metal product prices remained flat for the month and have expanded 1.0% on a year-over-year basis.
  • Prices for prepared asphalt, tar roofing, and siding fell 1.4% for the month but are up 1.7% on a year-ago basis.
  • Iron and steel prices fell 5.4% in February and are down 10.6% from the same time last year.
  • Steel mill products prices fell 1.8% for the month and are 3.6% lower than one year ago.
  • Softwood lumber prices fell 3.7% in February and are 4.4% lower than one year ago.
  • Natural gas prices fell 11.2% in February and are down 51.8% from one year ago.

 

Related Stories

| Nov 2, 2010

Wind Power, Windy City-style

Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021