flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction materials prices rise for first time in six months

Contractors

Construction materials prices rise for first time in six months

On a year-over-year basis, construction input prices fell 3.9%.


By Associated Builders and Contractors | March 13, 2015
Construction materials prices rise for first time in six months

"This rise is the first monthly gain since April 2014 and the eighth consecutive month in which petroleum prices were down on a year-over-year basis." said Associated Builders and Contractors Chief Economist Anirban Basu. Photo: Tosirog via Wikimedia Commons

The largest monthly gain in petroleum prices in over three years caused construction materials prices to expand 0.4 percent in February, ending a six-month streak when prices failed to rise, according to the March 13 producer price index release by the Bureau of Labor Statistics. On a year-over-year basis, construction input prices fell 3.9%. Nonresidential construction input prices also rose 0.4% on a monthly basis and were down 4.9% on a yearly basis.

"While conventional wisdom suggests that oil and natural gas prices will eventually rise, the adjustment period could be a lengthy one and although crude petroleum prices were up 12.3% on a monthly basis, this is likely a function of an abnormally cold February," said Associated Builders and Contractors Chief Economist Anirban Basu. "This rise is the first monthly gain since April 2014 and the eighth consecutive month in which petroleum prices were down on a year-over-year basis.

"For now, inventories of fuel remain elevated and most believe that the U.S. dollar's upward movement is not at an end," said Basu. "This, in addition to the quantitative easing that has begun in Europe and the potential for increasing interest rates in America, means that there is likely to be greater demand for U.S. fixed income assets, which will serve to further strengthen the U.S. dollar and put downward pressure on certain key construction input prices. This dynamic was widely apparent in February, during which prices for seven of the 11 key construction inputs failed to rise and no input other than crude petroleum increased in excess of one percent."

 

 

The following materials prices increased in February:

  • Nonferrous wire and cable prices grew 0.8% on a monthly basis but fell 4.4% on a yearly basis
  • Crude petroleum prices gained 12.3% in February but are down 53.4% from the same time last year.
  • Crude energy materials prices expanded 0.9% in February but are 45% lower year-over-year.
  • Concrete products prices expanded 0.2% in February and are up 4.3% on a yearly basis.

Seven of the 11 key construction inputs did not expand for the month:

  • Prices for plumbing fixtures fell 0.1% in February but are up 3.0% on a year-over-year basis.
  • Fabricated structural metal product prices remained flat for the month and have expanded 1.0% on a year-over-year basis.
  • Prices for prepared asphalt, tar roofing, and siding fell 1.4% for the month but are up 1.7% on a year-ago basis.
  • Iron and steel prices fell 5.4% in February and are down 10.6% from the same time last year.
  • Steel mill products prices fell 1.8% for the month and are 3.6% lower than one year ago.
  • Softwood lumber prices fell 3.7% in February and are 4.4% lower than one year ago.
  • Natural gas prices fell 11.2% in February and are down 51.8% from one year ago.

 

Related Stories

Sponsored | Building Team | Jun 20, 2017

Plan ahead when building in the west

Getting a project through plan review can be an unusually long process, anywhere from six months to two years.

Architects | May 9, 2017

Movers + Shapers: The social connector

Studio Gang gains fans with buildings that unite people and embrace the outside world.

Sponsored | Building Team | May 8, 2017

The builder is the building: Finding the right builder

The most important factor in making sure the where, when, what, and how go smoothly is making sure you pick the right who.

Architects | May 3, 2017

Avoiding trouble in paradise: Tips on building successfully in the Caribbean

The island setting itself is at the root of several of these disruptive assumptions.

Libraries | Apr 7, 2017

Eight recipients selected for the 2017 AIA/ALA Library Building Awards

Columbus Metropolitan Library, National Library of Latvia, and Varina Area Library were all honored by the AIA and ALA.

K-12 Schools | Apr 7, 2017

Is an alternative project delivery method right for your K-12 school district?

With California’s increasingly busy—and costly—construction market, it’s becoming more difficult to predict costs with a typical design-bid-build delivery method.

Market Data | Apr 6, 2017

Architecture marketing: 5 tools to measure success

We’ve identified five architecture marketing tools that will help your firm evaluate if it’s on the track to more leads, higher growth, and broader brand visibility.

Sports and Recreational Facilities | Apr 5, 2017

Informed design: A dynamic approach to athletic facilities design

With the completion of the athletic facility upgrade—dubbed the Arden Project—students will have access to state-of-the-art facilities.

Building Team | Apr 4, 2017

Dispelling five myths about post-occupancy evaluations

Many assume that post-occupancy (POE) is a clearly-defined term and concept, but the meaning of POE in practice remains wildly inconsistent.

Office Buildings | Apr 4, 2017

Amazon’s newest office building will be an ‘urban treehouse’

The building will provide 405,000 sf of office space in downtown Seattle.

boombox1
boombox2
native1

More In Category




Giants 400

Top 75 Engineering Firms for 2023

Kimley-Horn, WSP, Tetra Tech, Langan, and IMEG head the rankings of the nation's largest engineering firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021