flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction materials prices remain stable in November

Construction materials prices remain stable in November

Overall, construction materials prices fell 0.5 percent in November and are up only 1.1 percent year over year.


By Associated Builders and Contractors (ABC) | December 16, 2013
Photo: Ventrilock; FreeDigitalPhotos.net
Photo: Ventrilock; FreeDigitalPhotos.net

Overall, construction materials prices fell 0.5 percent in November and are up only 1.1 percent year over year, according to the Department of Labor’s Dec. 13 Producer Price Index.  Nonresidential construction materials are down 0.6 percent for the month and are 0.7 percent lower than the same time last year. 

“November represented another month of remarkable stability for construction input prices,” said Associated Builders and Contractors (ABC) Chief Economist Anirban Basu. “Although many investors predicted significant inflation this year due to expansionary monetary policies in much of the developed world, there continues to be a lack of significant inflationary pressures both globally and nationally.” 

Overall, the nation’s wholesale goods prices expanded 0.2 percent in November, but are down 0.9 percent year over year.  

“Next year is unlikely to offer as much stability as 2013,” Basu said. “Global economic growth is set to accelerate and the apparent budget deal in Congress should produce greater certainty among businesses, helping improve an already benign national economic forecast. Tension in the Middle East also continues to be a consideration. Together, these factors suggest materials price increases may be at least slightly more rapid in 2014.”

THE FOLLOWING MATERIALS PRICES INCREASED IN NOVEMBER:

  • Fabricated structural metal products were up 0.1 percent for the month and 0.3 percent year over year.  
  • Softwood lumber prices increased 2.6 percent on a monthly basis and are up 12.8 percent year over year.  
  • Natural gas prices were up 1.9 percent for the month and 3.3 percent on an annual basis.
  • Nonferrous wire and cable prices rose 0.2 percent on a monthly basis and are down 3 percent year over year.
  • Iron and steel prices were up 1.8 percent for the month and are down 0.1 percent compared to the same time last year.
  • Prices for plumbing fixtures and fittings inched up 0.1 percent in November and are up 1.6 percent year over year.  
  • Steel mill products prices increased 0.8 percent in November but are down 0.6 percent compared to the same time last year.  

THE FOLLOWING CONSTRUCTION INPUTS EXPERIENCED PRICE DECREASES IN NOVEMBER: 

  • Prepared asphalt, tar roofing and siding prices were down 3.8 percent for the month and 0.3 percent year over year.  
  • Crude petroleum prices fell 10.3 percent on a monthly basis but are up 0.9 percent year over year.
  • Crude energy prices decreased 5.7 percent in November but are up 0.6 percent compared to the same time last year.
  • Concrete products prices were flat in November and are up 2.8 percent year over year.

   

Related Stories

| Nov 29, 2011

First EPD awarded to exterior roof and wall products manufacturer

EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. 

| Nov 29, 2011

Suffolk Construction breaks ground on Boston residential tower

Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.

| Nov 29, 2011

Report finds credit crunch accounts for 20% of nation’s stalled projects

Persistent financing crunch continues to plague design and construction sector.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 29, 2011

Turner Construction establishes partnership with Clark Builders

Partnership advances growth in the Canadian marketplace.

| Nov 29, 2011

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 23, 2011

Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas

Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021