flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction materials prices remain stable in November

Construction materials prices remain stable in November

Overall, construction materials prices fell 0.5 percent in November and are up only 1.1 percent year over year.


By Associated Builders and Contractors (ABC) | December 16, 2013
Photo: Ventrilock; FreeDigitalPhotos.net
Photo: Ventrilock; FreeDigitalPhotos.net

Overall, construction materials prices fell 0.5 percent in November and are up only 1.1 percent year over year, according to the Department of Labor’s Dec. 13 Producer Price Index.  Nonresidential construction materials are down 0.6 percent for the month and are 0.7 percent lower than the same time last year. 

“November represented another month of remarkable stability for construction input prices,” said Associated Builders and Contractors (ABC) Chief Economist Anirban Basu. “Although many investors predicted significant inflation this year due to expansionary monetary policies in much of the developed world, there continues to be a lack of significant inflationary pressures both globally and nationally.” 

Overall, the nation’s wholesale goods prices expanded 0.2 percent in November, but are down 0.9 percent year over year.  

“Next year is unlikely to offer as much stability as 2013,” Basu said. “Global economic growth is set to accelerate and the apparent budget deal in Congress should produce greater certainty among businesses, helping improve an already benign national economic forecast. Tension in the Middle East also continues to be a consideration. Together, these factors suggest materials price increases may be at least slightly more rapid in 2014.”

THE FOLLOWING MATERIALS PRICES INCREASED IN NOVEMBER:

  • Fabricated structural metal products were up 0.1 percent for the month and 0.3 percent year over year.  
  • Softwood lumber prices increased 2.6 percent on a monthly basis and are up 12.8 percent year over year.  
  • Natural gas prices were up 1.9 percent for the month and 3.3 percent on an annual basis.
  • Nonferrous wire and cable prices rose 0.2 percent on a monthly basis and are down 3 percent year over year.
  • Iron and steel prices were up 1.8 percent for the month and are down 0.1 percent compared to the same time last year.
  • Prices for plumbing fixtures and fittings inched up 0.1 percent in November and are up 1.6 percent year over year.  
  • Steel mill products prices increased 0.8 percent in November but are down 0.6 percent compared to the same time last year.  

THE FOLLOWING CONSTRUCTION INPUTS EXPERIENCED PRICE DECREASES IN NOVEMBER: 

  • Prepared asphalt, tar roofing and siding prices were down 3.8 percent for the month and 0.3 percent year over year.  
  • Crude petroleum prices fell 10.3 percent on a monthly basis but are up 0.9 percent year over year.
  • Crude energy prices decreased 5.7 percent in November but are up 0.6 percent compared to the same time last year.
  • Concrete products prices were flat in November and are up 2.8 percent year over year.

   

Related Stories

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 30, 2012

Gilbane to manage retrofit of the Fraunhofer CSE R&B structure

Building is a first-of-its-kind research and demonstration building for sustainable technologies in Boston's Innovation District.

| Apr 30, 2012

KBE Building completes renovation at the ConnCAT

The $1.2 million project consisted of a 16,000-sf interior renovation.

| Apr 27, 2012

GreenExpo365.com to offer webinars on EPA’s WaterSense Program

Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.

| Apr 27, 2012

APA launches wood design web portal for building and design pros

Design professionals who are members of APA’s Professional Associates are automatically enrolled in the APA Designers Circle program.

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 27, 2012

CSM Group names Comerford as senior project manager

Comerford’s responsibilities include directing and verifying contract compliance by the trade contractors to ensure the owner’s expectations are met in respect to a quality finished project.

| Apr 27, 2012

Hampton Bays Middle School winner of the first National Green Ribbon Schools Program

School was the first LEED-certified public school in the state of New York.

| Apr 26, 2012

USGBC announces inaugural Green Apple Day of Service

On Sept. 29, 2012, participants from all over the world will volunteer to make the schools and campuses in their communities healthier and more sustainable.

| Apr 26, 2012

Gensler's Leiserowitz: Employs holistic philosophy to foster clients' creativity, comfort

Leiserowitz became regional managing principal in Chicago for San Francisco-based architecture and design giant Gensler a little more than a year ago.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021