flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction jobs increase in 40 states between November 2016 and November 2017

Contractors

Construction jobs increase in 40 states between November 2016 and November 2017

"There were robust construction gains in most parts of the country as the economy continues to expand," said AGC’s Stephen Sandherr.


By AGC of America | January 2, 2018

Forty states added construction jobs between November 2016 and November 2017, while 39 states added construction jobs between October and November, according to an analysis by the Associated General Contractors of America of Labor Department data released today. Association officials noted that firms in most states are adding jobs amid expectations that demand will continue to grow thanks to new tax cuts and regulatory reforms.

 "There were robust construction gains in most parts of the country as the economy continues to expand," said Stephen E. Sandherr, Chief Executive Officer for the association.  "Demand should continue to grow as newly enacted tax cuts and regulatory reforms stimulate even more widespread economic growth."

California added the most construction jobs (48,400 jobs, 6.2%) during the past year. Other states adding a high number of new construction jobs for the past 12 months include Florida (41,800 jobs, 8.7%); Texas (23,900 jobs, 3.4 percent); New York (12,600 jobs, 3.4 percent) and Pennsylvania (12,000 jobs, 4.6 percent). Nevada (13.8 percent, 10,900 jobs) added the highest percentage of new construction jobs during the past year, followed by Rhode Island (13 percent, 2,400 jobs); New Hampshire (10 percent, 2,600 jobs); Oregon (9.7 percent, 9,100 jobs) and Florida.

Ten states shed construction jobs between November 2016 and November 2017 while construction employment was unchanged in the District of Columbia. Missouri lost the highest number of construction jobs (-6,500 jobs, -5.3%), followed by Iowa (-6,100 jobs, -7.5%); North Carolina (-3,100 jobs, -1.5%) and North Dakota (-1,600 jobs, -4.8%).  Iowa lost the highest percentage for the year, followed by Missouri; North Dakota; Montana (-3.5%, 1,000 jobs) and South Dakota (-1.7%, -400 jobs).

Among the 39 states that added construction jobs between October and November, Texas added more than any other state (8,200 jobs, 1.1%), followed by Florida (6,200 jobs, 1.2%); New York (5,300 jobs, 1.4%); Indiana (4,900 jobs, 3.6%) and Pennsylvania (3,400 jobs, 1.4%). Alaska added the highest percentage of construction jobs for the month (4.5%, 700 jobs), followed by Indiana; Nebraska (2.6%, 1,300 jobs); Rhode Island (2.5%, 500 jobs) and West Virginia (2.5%, 800 jobs).

Eleven states lost construction jobs between October and November, while construction employment was unchanged in D.C. Maryland lost the most construction jobs for the month (-1,900 jobs, -1.1%), followed by Oklahoma (-1,400 jobs, -1.7%) and Connecticut (-1,300 jobs, -2.2%). Vermont (-3.2%, -500 jobs) lost the highest percentage of construction jobs, followed by Wyoming (-2.9%, -600 jobs) and Montana (-2.2%, -600 jobs).

Association officials noted that many construction firms have high expectations for the coming year. They said that as they prepare an annual construction industry outlook the association and Sage Construction and Real Estate will release on January 3rd, it is clear many firms expect the administration's efforts to reduce needless regulatory burdens and newly enacted tax cuts will further improve market conditions.

"This is one of the best business climates many firms have experienced in over a decade," Sandherr said. "While Washington needs to address infrastructure funding, workforce shortages and multi-employer retirement reforms, 2018 looks to be a strong year for the industry."   

View the state employment data by rank and state. View the state employment map.

Related Stories

| Feb 14, 2011

Sustainable Roofing: A Whole-Building Approach

According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Feb 11, 2011

Four Products That Stand Up to Hurricanes

What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.

| Feb 11, 2011

RS Means Cost Comparison Chart: Office Buildings

This month's RS Means Cost Comparison Chart focuses on office building construction.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

| Feb 11, 2011

BIM-enabled Texas church complex can broadcast services in high-def

After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Feb 11, 2011

Former Richardson Romanesque hotel now houses books, not beds

The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.

| Feb 11, 2011

Justice center on Fall River harbor serves up daylight, sustainable elements, including eucalyptus millwork

Located on historic South Main Street in Fall River, Mass., the Fall River Justice Center opened last fall to serve as the city’s Superior and District Courts building. The $85 million facility was designed by Boston-based Finegold Alexander + Associates Inc., with Dimeo Construction as CM and Arup as MEP. The 154,000-sf courthouse contains nine courtrooms, a law library, and a detention area. Most of the floors have the same ceiling height, which will makes them easier to reconfigure in the future as space needs change. Designed to achieve LEED Silver, the facility’s elliptical design offers abundant natural daylight and views of the harbor. Renewable eucalyptus millwork is one of the sustainable features.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021