flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction employment declines between January '09 and '10

Construction employment declines between January '09 and '10


By BD+C staff | August 11, 2010

The construction workforce was smaller in every state and the District of Columbia in January 2010 than it was just 12 months earlier, according to a new analysis of federal data released today by the Associated General Contractors of America. The data indicated just how widespread the construction downturn is, association officials said, noting that 38 states and D.C. experienced a double digit percentage drop in construction employment.

"Construction employment is dropping everywhere and plummeting almost everywhere," said Ken Simonson, the association's chief economist. "Looking at this data, it is quite clear that the construction industry has yet to hit bottom."

Simonson noted that California lost more construction jobs, 128,700, while North Dakota lost the least jobs, 200, over the past twelve months. The five states with the largest percentage decline in employment were Nevada (29.9 percent); Arizona (26 percent); Colorado (22.2 percent); Idaho (21 percent); and Florida (20.4 percent). Meanwhile, North Dakota (1 percent); Nebraska (4.1 percent); Alaska (4.2 percent); South Dakota (5.9 percent); and Arkansas (6.2 percent) experienced the smallest decline in construction employment.

Even the monthly employment changes reflect the tough construction conditions, said Simonson, noting that 31 states lost construction jobs between December and January. He added that most of the states adding jobs for the month lost jobs in December, often more than they gained back in January. The economist said this suggested the monthly data was affected by unseasonable weather conditions that also are likely to affect February's state employment figures.

Association officials cited the new state employment data in urging the Senate to pass a ten month extension to the nation's surface transportation program and for the administration to accelerate stimulus-funded construction projects. "As privately-funded construction activity continues to decline, federal investments in infrastructure are often the difference between a job and unemployment for what's left of the industry."

View the state-by-state employment data.

Related Stories

Virtual Reality | Jun 16, 2023

Can a VR-enabled AEC Firm transform building projects?

With the aid of virtual reality and 3D visualization technologies, designers, consultants, and their clients can envision a place as though the project were in a later stage.

Mechanical Systems | Jun 16, 2023

Cogeneration: An efficient, reliable, sustainable alternative to traditional power generation

Cogeneration is more efficient than traditional power generation, reduces carbon emissions, has high returns on the initial investment, improves reliability, and offers a platform for additional renewable resources and energy storage for a facility. But what is cogeneration? And is it suitable for all facilities?

Office Buildings | Jun 15, 2023

An office building near DFW Airport is now home to two Alphabet companies

A five-minute drive from the Dallas-Fort Worth International Airport, the recently built 2999 Olympus is now home to two Alphabet companies: Verily, a life sciences business, and Wing, a drone delivery company. Verily and Wing occupy the top floor (32,000 sf and 4,000 sf, respectively) of the 10-story building, located in the lakeside, work-life-play development of Cypress Waters.

Transit Facilities | Jun 15, 2023

Arlington, Va., transit station will support zero emissions bus fleet

Arlington (Va.) Transit’s new operations and maintenance facility will support a transition of their current bus fleet to Zero Emissions Buses (ZEBs). The facility will reflect a modern industrial design with operational layouts to embrace a functional aesthetic. Intuitive entry points and wayfinding will include biophilic accents.

Urban Planning | Jun 15, 2023

Arizona limits housing projects in Phoenix area over groundwater supply concerns

Arizona will no longer grant certifications for new residential developments in Phoenix, it’s largest city, due to concerns over groundwater supply. The announcement indicates that the Phoenix area, currently the nation’s fastest-growing region in terms of population growth, will not be able to sustain its rapid growth because of limited freshwater resources. 

Multifamily Housing | Jun 15, 2023

Alliance of Pittsburgh building owners slashes carbon emissions by 45%

The Pittsburgh 2030 District, an alliance of property owners in the Pittsburgh area, says that it has reduced carbon emissions by 44.8% below baseline. Begun in 2012 under the guidance of the Green Building Alliance (GBA), the Pittsburgh 2030 District encompasses more than 86 million sf of space within 556 buildings. 

Industry Research | Jun 15, 2023

Exurbs and emerging suburbs having fastest population growth, says Cushman & Wakefield

Recently released county and metro-level population growth data by the U.S. Census Bureau shows that the fastest growing areas are found in exurbs and emerging suburbs. 

Healthcare Facilities | Jun 14, 2023

Design considerations for behavioral health patients

The surrounding environment plays a huge role in the mental state of the occupants of a space, especially behavioral health patients whose perception of safety can be heightened. When patients do not feel comfortable in a space, the relationships between patients and therapists are negatively affected.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

University Buildings | Jun 14, 2023

Calif. State University’s new ‘library-plus’ building bridges upper and lower campuses

A three-story “library-plus” building at California State University, East Bay (CSUEB) that ties together the upper and lower campuses was recently completed. The 100,977-sf facility, known as the Collaborative Opportunities for Research & Engagement (“CORE”) Building, is one of the busiest libraries in the CSU system. The previous library served 1.2 million visitors annually.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021