flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction economists optimistic about 2014 growth

Construction economists optimistic about 2014 growth

ABC’s quarterly Construction Backlog Indicator (CBI) will be released Aug. 19.


By Associated Builders and Contractors | August 5, 2014
Associated Builders and Contractors (ABC) Chief Economist Anirban Basu, American Institute of Architects (AIA) Chief Economist Kermit Baker and National Association of Home Builders (NAHB) Chief Economist David Crowe provided a collaborative economic forecast combining their expert economic analysis on leading, present and lagging economic indicators.
 
"A combination of low interest rates; wealth effects stemming from a booming stock market and rising home prices; surging energy production; and expanding industrial output has helped position the U.S. economy for more rapid growth during the next several quarters," said ABC Chief Economist Anirban Basu. "This will lead to more robust recovery in the U.S. nonresidential construction industry, which has also been aided by stable materials prices and improving commercial real estate fundamentals. ABC predicts 7 percent nominal nonresidential construction growth in 2014, despite ongoing challenges in the public construction segment."
 
"We continue to have an optimistic outlook for the commercial and industrial sectors for the rest of this year and into 2015," said AIA Chief Economist Kermit Baker, PhD, Hon. AIA. "However, until we see state and local governments ramp up spending for new education, health care and public safety structures there likely won’t be a widespread acceleration in spending for the entire industry."
 
"Economic pick-up in the second quarter was coupled with a return in housing construction," said David Crowe, chief economist for NAHB. "We expect continued modest growth in housing construction as employment rises and more household formations take place. However, continued tight supplies of labor and land will put upward pressure on new home prices."
 
In addition to this forecast, AIA released its latest Architecture Billings Index (ABI) July 23, NAHB released its latest NAHB/Wells Fargo Housing Market Index (HMI) July 16 and ABC’s quarterly Construction Backlog Indicator (CBI) will be released Aug. 19.

Related Stories

| Apr 16, 2012

$80 million in export financing for solar project in India

The project, “Rajasthan Sun Technique Energy Private Limited,” is a subsidiary of Reliance Power and is being co-financed by the Asian Development Bank and FMO, the Dutch development bank.

| Apr 13, 2012

Arcadis merges with Davis Langon & Seah

Merger will help company expand business in Asia.

| Apr 13, 2012

Goettsch Partners designs new music building for Northwestern

The showcase facility is the recital hall, an intimate, two-level space with undulating walls of wood that provide optimal acoustics and lead to the stage, as well as a 50-foot-high wall of cable-supported, double-skin glass

| Apr 13, 2012

Best Commercial Modular Buildings Recognized

Judges scored building entries on a number of criteria including architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete, while marketing pieces were judged on strategy, implementation, and quantifiable results. Read More

| Apr 12, 2012

Solar PV carport, electrical charging stations unveiled in California

Project contractor Oltman Construction noted that the carport provides shaded area for 940 car stalls and generates 2 MW DC of electric power.

| Apr 11, 2012

Shawmut appoints Tripp as business development director

Tripp joined Shawmut in 1998 and previously held the positions of assistant superintendent, superintendent, and national construction manager.

| Apr 11, 2012

Corgan & SOM awarded contract to design SSA National Support Center

The new SSA campus is expected to meet all Federal energy and water conservation goals while achieving LEED Gold Certification from the United States Green Building Council.

| Apr 11, 2012

C.W. Driver completes Rec Center on CSUN campus

The state-of-the-art fitness center supports university’s goal to encourage student recruitment and retention.

| Apr 10, 2012

JE Dunn completes two medical office buildings at St. Anthony’s Lakewood, Colo. campus

Designed by Davis Partnership Architects, P.C., Medical Plaza 1 and 2 are four-story structures totaling 96,804-sf and 101,581-sf respectively.

boombox1
boombox2
native1

More In Category



Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021