In light of the current construction environment, construction defect resolution experts at LiMa Solutions are hosting a symposium on July 26 and 27 titled "Drawing a Line at the Bottom Line - Strategies for Reducing Construction Defect Litigation Costs."
The symposium will provide insurance carriers, developers, general contractors and subcontractors with successful strategies for reducing construction defect litigation costs. It will address many of the tough issues facing litigants today - and address how to stay in business in this challenging environment - with emphasis on the development of forward-thinking solutions that can be quickly implemented.
Sessions will be led by industry insiders who will share real solutions for reducing litigation costs. Insurance and construction professionals with a breadth of experience navigating construction defect cases will address the obstructions and hindrances that challenge efficient and equitable resolution. Judicial and legal panelists with extensive backgrounds in construction and insurance arbitration will provide their thoughts on the current state of the litigation process. Construction defect experts will present innovative resolution concepts that can save valuable resources, time and money.
On July 26 and 27, 2012 at the Westin Key West Resort and Marina, the symposium will consist of four presentations split between two half-day sessions, leaving time each day for networking. Continuing education credits (MCLE/CE/CPE) are being pursued and will be announced on the event website.
In order to keep the symposium intimate and focused, attendance is limited. For registration and event information, visit http://limasolutions.com. +
Related Stories
| Nov 16, 2011
John Patelski joins Ghafari as executive vice president
As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.
| Nov 15, 2011
Struggling economy demands construction industry embrace enterprise-wide risk management
In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.
| Nov 14, 2011
Summit Design+Build selected at GC for new Office Concepts headquarters
The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout.
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Nov 14, 2011
VanSumeren appointed to Traco general manager
VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco.