flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction Defect Symposium will examine strategies for reducing litigation costs

Construction Defect Symposium will examine strategies for reducing litigation costs

July event in Key West will target decision makers in the insurance and construction industries.


By Posted by Tim Gregorski, Senior Editor | May 9, 2012

In light of the current construction environment, construction defect resolution experts at LiMa Solutions are hosting a symposium on July 26 and 27 titled "Drawing a Line at the Bottom Line - Strategies for Reducing Construction Defect Litigation Costs."

The symposium will provide insurance carriers, developers, general contractors and subcontractors with successful strategies for reducing construction defect litigation costs. It will address many of the tough issues facing litigants today - and address how to stay in business in this challenging environment - with emphasis on the development of forward-thinking solutions that can be quickly implemented.

Sessions will be led by industry insiders who will share real solutions for reducing litigation costs. Insurance and construction professionals with a breadth of experience navigating construction defect cases will address the obstructions and hindrances that challenge efficient and equitable resolution. Judicial and legal panelists with extensive backgrounds in construction and insurance arbitration will provide their thoughts on the current state of the litigation process. Construction defect experts will present innovative resolution concepts that can save valuable resources, time and money.

On July 26 and 27, 2012 at the Westin Key West Resort and Marina, the symposium will consist of four presentations split between two half-day sessions, leaving time each day for networking. Continuing education credits (MCLE/CE/CPE) are being pursued and will be announced on the event website.

In order to keep the symposium intimate and focused, attendance is limited. For registration and event information, visit http://limasolutions.com. +

Related Stories

| May 10, 2012

Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond

Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.

| May 10, 2012

Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction

Certification for existing buildings under these two rating programs has overtaken that for new construction.

| May 10, 2012

Chapter 4 Business Case for High-Performance Reconstructed Buildings

Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.

| May 10, 2012

Chapter 3 How Building Technologies Contribute to Reconstruction Advances

Building Teams are employing a wide variety of components and systems in their reconstruction projects.

| May 10, 2012

Chapter 2 Exemplary High-Performance Reconstruction Projects

Several case studies show how to successfully renovate existing structures into high-performance buildings.

| May 9, 2012

Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings

As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.

| May 9, 2012

International green building speaker to keynote Australia’s largest building systems trade show

Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.

| May 9, 2012

Tishman delivers Revel six weeks early

Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.

| May 9, 2012

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.

| May 9, 2012

Shepley Bulfinch given IIDA Design award for Woodruff Library?

The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021