In light of the current construction environment, construction defect resolution experts at LiMa Solutions are hosting a symposium on July 26 and 27 titled "Drawing a Line at the Bottom Line - Strategies for Reducing Construction Defect Litigation Costs."
The symposium will provide insurance carriers, developers, general contractors and subcontractors with successful strategies for reducing construction defect litigation costs. It will address many of the tough issues facing litigants today - and address how to stay in business in this challenging environment - with emphasis on the development of forward-thinking solutions that can be quickly implemented.
Sessions will be led by industry insiders who will share real solutions for reducing litigation costs. Insurance and construction professionals with a breadth of experience navigating construction defect cases will address the obstructions and hindrances that challenge efficient and equitable resolution. Judicial and legal panelists with extensive backgrounds in construction and insurance arbitration will provide their thoughts on the current state of the litigation process. Construction defect experts will present innovative resolution concepts that can save valuable resources, time and money.
On July 26 and 27, 2012 at the Westin Key West Resort and Marina, the symposium will consist of four presentations split between two half-day sessions, leaving time each day for networking. Continuing education credits (MCLE/CE/CPE) are being pursued and will be announced on the event website.
In order to keep the symposium intimate and focused, attendance is limited. For registration and event information, visit http://limasolutions.com. +
Related Stories
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.