David M. Schwarz Architects has completed the Smith Center for the Performing Artsin Las Vegas.
Several physical details of the Hoover Dam provided inspiration for the design of the 358,000-sf Smith Center, including the massing and articulation of its water intake towers; the care taken with concrete, stone and terrazzo finishes; the incorporation of art, iconography and ornamentation on both the exterior and interior; and the aspiration to create a timeless structure that lasts for many generations beyond its creators.
Sited at the heart of 61 acres of environmentally remediated and reclaimed rail yards, The Smith Center accommodates multiple venues for a broad range of performance genres and events.
The 2,050-seat Reynolds Hall with its dramatic stage, stunning balconies, and full orchestra pit will host orchestra, opera, dance, Broadway and first-run touring attractions from around the world. The Boman Pavilion is home to more intimate musical and drama settings, including Cabaret Jazz and the Troesh Studio Theater, plus classrooms, offices and ground level retail. The Pavilion overlooks Symphony Park, a 1.7-acre outdoor venue, which will host performances and events, and other entertainment gatherings.
Additionally, The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification. BD+C
Related Stories
| Apr 6, 2012
Rooftop solar energy program wins critical approval from L.A. city council
Los Angeles Business Council applauds decision allowing LADWP to create new national model for rooftop solar energy
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 6, 2012
Perkins Eastman unveils Qatar mixed-use sports complex
Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.
| Apr 5, 2012
5 tips for a successful door and window retrofit
An exclusive tip sheet to help the Building Team manage door and window retrofits successfully.
| Apr 4, 2012
Educational facilities see long-term benefits of fiber cement cladding
Illumination panels made for a trouble-free, quick installation at a cost-effective price.
| Apr 4, 2012
HDS designs Mount Auburn Hospital’s new healthcare center in Waltham, Mass.
HDS Architecture provided design services for all the Mount Auburn Healthcare suites including coordination of HVAC and FP engineering.
| Apr 4, 2012
Bald joins the Harmon glazing team
Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he was the regional manager of the Mid-Atlantic region.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 4, 2012
San Antonio animal hospital earns LEED Platinum certification
Middleman Construction Company builds the city?s first commercial building to earn certification.
| Apr 4, 2012
Hason joins RNL’s as MENA regional director
Hason specializes in planning and urban design, hospitality, office, corporate headquarters and transportation structures, as well as, higher education and museum facilities.