David M. Schwarz Architects has completed the Smith Center for the Performing Artsin Las Vegas.
Several physical details of the Hoover Dam provided inspiration for the design of the 358,000-sf Smith Center, including the massing and articulation of its water intake towers; the care taken with concrete, stone and terrazzo finishes; the incorporation of art, iconography and ornamentation on both the exterior and interior; and the aspiration to create a timeless structure that lasts for many generations beyond its creators.
Sited at the heart of 61 acres of environmentally remediated and reclaimed rail yards, The Smith Center accommodates multiple venues for a broad range of performance genres and events.
The 2,050-seat Reynolds Hall with its dramatic stage, stunning balconies, and full orchestra pit will host orchestra, opera, dance, Broadway and first-run touring attractions from around the world. The Boman Pavilion is home to more intimate musical and drama settings, including Cabaret Jazz and the Troesh Studio Theater, plus classrooms, offices and ground level retail. The Pavilion overlooks Symphony Park, a 1.7-acre outdoor venue, which will host performances and events, and other entertainment gatherings.
Additionally, The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification. BD+C
Related Stories
| Dec 9, 2012
14 great solutions
Welcome to the third installment of Building Design+Construction’s “Great Solutions,” highlighting 14 innovative technologies and products that you can put to work in your next project.
| Dec 9, 2012
AEC professionals cautiously optimistic about commercial construction in ’13
Most economists say the U.S. is slowly emerging from the Great Recession, a view that was confirmed to some extent by an exclusive survey of 498 BD+C subscribers whose views we sought on the commercial construction industry’s outlook on business prospects for 2013.
| Dec 7, 2012
Structural glazing sealant protects solar-rooftop stadium in Taiwan
Designers of the Kaohsiung World Games Main Stadium in Gaoxiong, Taiwan, powered by almost 9,000 rooftop solar panels, required an effective panel fixing design offering optimum energy transfer rate, plus thermal and weathertight performance. Dow Corning specialists recommended a four-sided structural sealant solution featuring Dow Corning 983 Structural Glazing Sealant.
| Dec 6, 2012
Ziegler Cooper names Soto as Director of Design, Broadens Design Capabilities
Soto will oversee design efforts, bringing a high level of quality and problem solving capabilities through active engagement with clients and studios firm wide.
| Dec 5, 2012
Gilbane publishes Winter 2012 construction economic report
Report outlines impact of recent events; predicts continued movement, while slow, toward recovery.
| Dec 5, 2012
Gehry-designed New York City tower receives Emporis Skyscraper Award
8 Spruce Street is now the third New York tower to win the Emporis Skyscraper Award.
| Dec 4, 2012
MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award
MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project.
| Dec 4, 2012
Thornton Tomasetti opens new office in São Paulo, Brazil
The move to São Paulo is strategic and timely, as the country continues preparations for the 2014 World Cup and 2016 Olympic Games in Rio de Janeiro.
| Dec 4, 2012
Greenhorne & O’Mara signs letter of intent to join Stantec
Acquisitions of C3TS and Architecture 2000 also completed.