David M. Schwarz Architects has completed the Smith Center for the Performing Artsin Las Vegas.
Several physical details of the Hoover Dam provided inspiration for the design of the 358,000-sf Smith Center, including the massing and articulation of its water intake towers; the care taken with concrete, stone and terrazzo finishes; the incorporation of art, iconography and ornamentation on both the exterior and interior; and the aspiration to create a timeless structure that lasts for many generations beyond its creators.
Sited at the heart of 61 acres of environmentally remediated and reclaimed rail yards, The Smith Center accommodates multiple venues for a broad range of performance genres and events.
The 2,050-seat Reynolds Hall with its dramatic stage, stunning balconies, and full orchestra pit will host orchestra, opera, dance, Broadway and first-run touring attractions from around the world. The Boman Pavilion is home to more intimate musical and drama settings, including Cabaret Jazz and the Troesh Studio Theater, plus classrooms, offices and ground level retail. The Pavilion overlooks Symphony Park, a 1.7-acre outdoor venue, which will host performances and events, and other entertainment gatherings.
Additionally, The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification. BD+C
Related Stories
| Apr 10, 2013
6 funding sources for charter school construction
Competition for grants, loans, and bond financing among charter schools is heating up, so make your clients aware of these potential sources.
| Apr 10, 2013
23 things you need to know about charter schools
Charter schools are growing like Topsy. But don’t jump on board unless you know what you’re getting into.
| Apr 9, 2013
FMI predicts 8% rise in construction put in place for 2013
FMI, the largest provider of management consulting and investment banking services to the engineering and construction industry released today its Q1-2013 Construction Outlook. The forecast for total construction-put-in-place for 2013 continues to show an increase of 8% over 2012 levels.
| Apr 8, 2013
Most daylight harvesting schemes fall short of performance goals, says study
Analysis of daylighting control systems in 20 office and public spaces shows that while the automatic daylighting harvesting schemes are helping to reduce lighting energy, most are not achieving optimal performance, according to a new study by the Energy Center of Wisconsin.
| Apr 6, 2013
Lord, Aeck & Sargent and Urban Collage merge
In a move that brings full-service planning expertise to its already well-established architecture practice, Lord, Aeck & Sargent (LAS) has merged with Urban Collage (UC), one of the largest urban and campus planning and design firms in the Southeast. Combining these firms’ talents was made official today. UC plans to retain its name for the foreseeable future.
| Apr 6, 2013
First look: GlaxoSmithKline's double LEED Platinum office
GlaxoSmithKline and Liberty Property Trust/Synterra Partners transform the work environment with the opening of Five Crescent Drive