flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction bidding activity ticks up in February

Contractors

Construction bidding activity ticks up in February

The Blue Book Network's Velocity Index measures month-to-month changes in bidding activity among construction firms across five building sectors and in all 50 states. 


By Blue Book Building & Construction Network | April 9, 2021
Construction bidding activity ticks up in February

Photo: Pixabay

   

The Blue Book Network Velocity Index ticked up 0.5% to 100.9 in February from a revised 100.5 in January (December 2018 = 100). This the most stable the Index has been since before the pandemic began. 

The Blue Book Network Velocity Index is a measure of month-to-month changes in bidding activity in The Blue Book Network, accounting for seasonality, providing a leading indicator of construction spending to inform critical decision making.  

 

 

Analysis by building sector shows that the manufacturing, institutional, and multifamily categories fell back slightly, but were offset by gains in commercial and lodging. Lodging jumped nearly 50% to 69.4 following a 44% increase from December to January.

Some highlights:
• The institutional building sector dipped 2.5% to 117.2, but showed strengthening in the Midwestern states
• The manufacturing sector was mostly unchanged, with Pennsylvania, Massachusetts, Virginia, Washington, and Louisiana gaining
• The commercial buildings sector climbed 3.6% to 75.1
• Lodging continued its two-month recovery with strong gains mostly in the Sun Belt
• Multifamily, while down slightly, remained strong at 118.8, bolstered by Midwest and Southeast states
• States split the difference in February, with 22 on the rise
• Midwest states held the line with most showing moderate increases
• Larger states losing ground included California, Florida, New York, and Texas, with modest declines.

More on the The Blue Book Network Velocity Index.

 

Related Stories

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

| Feb 27, 2012

Consigli complete first building for Bigelow Ocean Sciences Campus

Designed by WBRC Architects Engineers in association with Perkins + Will.

| Feb 27, 2012

Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.

Intricate interior project involved construction of more than 80 offices.

| Feb 27, 2012

Research Institute at Texas Children’s Hospital building receives LEED Gold

Innovative and sustainable design reflects best environmental building practices.

| Feb 26, 2012

Milwaukee U-Haul facility receives LEED-CI Silver

The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.

| Feb 26, 2012

Hollister Construction awarded 42,000-sf office fit-out in Holtsville, N.Y.

Space leased by U.S. General Service Administration.

| Feb 26, 2012

Alvarez-Glasman & Colvin’s Chen LEED certified

Chen works closely with property owners to ensure that their properties meet and exceed all industry standards, and also provide long-term energy savings.

| Feb 24, 2012

ABI remains positive for three straight months

The AIA reported the January ABI score was 50.9, following a mark of 51.0 in December.

| Feb 24, 2012

Larry Lord joins HDR Architecture as south region science and technology director

A founding partner at Lord, Aeck & Sargent, Lord is nationally renowned for his leadership in architecture for complex projects.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021