flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on the U.S. Naval Academy’s new cyber studies and computer science department building, Hopper Hall

Higher Education

Construction begins on the U.S. Naval Academy’s new cyber studies and computer science department building, Hopper Hall

The building marks the first purpose built structure for cyber studies based at an academy.


By David Malone, Associate Editor | November 17, 2016

Image courtesy SOM / © Smilodon

A new six-story, 206,400-sf building is currently under construction on the U.S. Naval Academy’s campus that will house cyber studies, the computer science department, and other related disciplines.

Hopper Hall, named after Rear Admiral Grace Hopper, is the first academic building named after a woman at a major service academy in the United States and is also the first purpose built facility dedicated to cyber warfare based at an academy.

Skidmore, Owings & Merrill LLP (SOM) is serving as the design lead on Turner Construction’s design-build team. "Our design for Hopper Hall will serve the Naval Academy's mission to equip a new generation of leaders with the knowledge and resources to protect the nation against 21st-century threats," says Roger Duffy, Design Partner at SOM, in a press release.

The building has been designed for a triangular waterfront site that will reinforce the Naval Academy campus’ connection to the waterfront with clear sightlines through the building. Hopper Hall will include classrooms, teaching and research laboratories, offices, multi-purpose space, an observatory, and a research and testing tank. “The Bridge” will be a central hub and gathering space where all activities taking place in the building will converge.

Once complete, Hopper Hall will become the first new academic building built on the Naval Academy’s campus since 1975.

Related Stories

| Jun 8, 2012

Nauset Construction completing sustainable dorm for Brooks School

Student input on green elements provides learning experience.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

| May 31, 2012

Perkins+Will-designed engineering building at University of Buffalo opens

Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 21, 2012

Wayne, Pa.'s Radnor Middle School wins national green award

Radnor Middle School among the most sustainable schools in the U.S.

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021