flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on Phase I of $240 million mixed-use development in Boston

Mixed-Use

Construction begins on Phase I of $240 million mixed-use development in Boston

Fenway Center will span 4.5 acres between Brookline, Beacon Street, David Ortiz Way, and the Massachusetts Turnpike.


By David Malone, Associate Editor | December 12, 2017
Fenway Center from the East

Rendering courtesy of Fenway Center Development

Fenway Center, Boston’s newest mixed-use development, is now under construction adjacent to Fenway Park.

Fenway Center Development LLC, the project’s developer, announced joint venture partners Gerding Edlen, TH Real Estate, and Meredith Management have signed a long-term ground lease with the Massachusetts Department of Transportation for Phase I of Fenway Center.

 

Aerial view of Fenway Center westRendering courtesy of Fenway Center Development.

 

Phase I of the new mixed-use development will take two years to complete and will comprise two residential apartment buildings with 312 units, 37,000 sf of ground floor retail, and 200 underground parking spaces. A 12,000-sf air rights deck and landscaped pedestrian walkway over Yawkey Station and between Beacon St. and Yawkey Station is also included.

Fenway Center will replace a large surface parking lot. It’s buildings are arranged so the taller ones are located next to Yawkey Station to serve as an architectural marker and gateway, while the smaller buildings are scaled down in respect to the Audubon Circle neighborhood and Fenway park area.

 

View of Fenway Center from BeaconRendering courtesy of Fenway Center Development.

 

Phase I of Fenway Center is slated for completion by the beginning of 2020.

 

Fenway Center view westRendering courtesy of Fenway Center Development.

Tags

Related Stories

| Aug 11, 2010

See what $3,000 a month will get you at Chicago’s Aqua Tower

Magellan Development Group has opened three display models for the rental portion of Chicago’s highly anticipated Aqua Tower, designed by Jeanne Gang. Lease rates range from $1,498 for a studio to $3,111 for a two-bedroom unit with lake views.

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Casino Queen breaks ground on $2.15 million entertainment venue

The Casino Queen in East St. Louis, Ill., is raising the stakes in its bid to capture a larger share of the local gaming market with the start of construction on a new $2.15 million sports bar and entertainment venue that will enhance the overall experience for guests.

| Aug 11, 2010

Outdated office tower becomes Nashville’s newest boutique hotel

A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven “cardio” rooms.

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021