flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on North Carolina State University’s new engineering building

University Buildings

Construction begins on North Carolina State University’s new engineering building

Skanska is building the facility.


By David Malone, Associate Editor | September 6, 2018
Fitts-Woolard hall rendering

Courtesy NC State

North Carolina State University graduates over 2,500 engineers and computer scientists every year, and future students will soon have a new engineering building to call home. Fitts-Woolard Hall is a 224,000-sf, four-story building that will complete the College of Engineering’s move to NC State’s Centennial Campus.

The building will support broad initiatives in areas such as advanced materials and manufacturing, robotics and sensor technology, service sector engineering, critical infrastructure and security, transportation and logistics, and energy and environmental systems.

 

See Also: Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

 

The building will house the Edward P. Fitts Department of Industrial and Systems Engineering, the Department of Civil, Construction, and Environmental Engineering, and the College of Engineering Dean’s administrative offices.

Two entrance lobbies are connected by a wide corridor with views into engineering labs and open stairs. The first floor is built into the slope of the site with a concrete structure and below-grade cast-in-place retaining walls. The second floor is cast-in-place elevated slab construction while levels three, four, and the roof will be steel-frame construction. The skin of the building will consist of curtainwall and brick veneer.

The building will comprise heavy labs, light labs, classrooms, grad spaces, and administration offices.

Related Stories

University Buildings | Feb 16, 2018

The University of Washington receives a new Nanoengineering and Sciences Building

The building marks the second phase of a 168,000-sf complex.

University Buildings | Jan 31, 2018

Report: Spending spree on new buildings a risky venture for some U.S. universities

Higher education institutions continue to add new buildings in spite of increased stress on facilities management budgets, according to a new report from Sightlines.

Healthcare Facilities | Jan 29, 2018

The new Virginia Tech Biomedical Research Addition will include research facilities in five thematic areas

The project is a collaboration between Carilion Clinic and Virginia Tech.

University Buildings | Jan 19, 2018

A 360-degree classroom highlights Washington State University’s new academic innovation hub

The circle-in-the-round classroom can accommodate 275 students.

Game Changers | Jan 12, 2018

‘Kit of parts’ anchors university’s remake

Sasaki designs interchangeable spaces to support a major educational shift at Mexico’s largest university system.

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Healthcare Facilities | Jan 6, 2018

A new precision dental center embodies Columbia University’s latest direction for oral medicine education

The facility, which nests at “the core” of the university’s Medical Center, relies heavily on technology and big data. 

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021