flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins for Kengo Kuma-designed twisted Rolex tower in Dallas

High-rise Construction

Construction begins for Kengo Kuma-designed twisted Rolex tower in Dallas

Gradually rotating floor plates make room for a planted terrace on each floor


By Adilla Menayang, Assistant Digital Editor | August 12, 2015
Construction begins for Kengo Kuma-designed twisted Rolex tower in Dallas

The tower is being constructed in an 18-block master plan developed by Harwood International. Renderings courtesy Kengo Kuma Architects

Going straight up toward the sky seems to be the unfashionable thing to do for skyscrapers these days. Dezeen released renderings of Swiss watchmaker Rolex’s new office tower in Dallas, which just started construction.

Architect Kengo Kuma’s design for the tower twists upward, a typology that is currently a trend, as seen in SOM’s design for towers in Sweden and the United Arab Emirates, as well as Studio Jeanne Gang’s proposed tower in San Francisco, MVRDV’s tower design for Vienna, and BIG’s “surprise-in-the-middle” tower designed for Frankfurt, Germany. Then, of course, there's Santiago Calatrava's Turning Torso tower in Malmö, Sweden, which recently won CTBUH's 10 Year Award.

In Kengo Kuma’s scheme, the plates of each floor are placed gradually rotating, allowing for planted terraces on every level.

The architect is working with landscape architect Sadafumi Uchiyama for the office building’s gardens, which Dezeen reports will feature “rampart stone walls, reflecting pools, and cascading waterfalls.”

Harwood International, the project’s developer, says that the Rolex tower will open late 2016, and will be the ninth completed project in the master plan for the 18-block area in Dallas’ Uptown neighborhood.

Dezeen has the full report.

 

Related Stories

| Jun 6, 2012

KPF designs tower for Yongsan IBD

The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.

| Jun 6, 2012

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 15, 2012

One World Trade Center goes to new height of sustainability

One of the biggest challenges in developing this concrete mixture was meeting the Port Authority of New York/New Jersey’s strict requirement for the replacement of cement.

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 1, 2012

Time-lapse video: World Trade Center, New York

One World Trade Center, being built at the site of the fallen twin towers, surpassed the Empire State Building on Monday as the tallest building in New York.

boombox1
boombox2
native1

More In Category



Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021