flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on downtown Phoenix’s PALMtower

Multifamily Housing

Construction begins on downtown Phoenix’s PALMtower

The multifamily tower will rise 28-stories.


By David Malone, Managing Editor | January 12, 2022
PALMtower exterior
Courtesy Clayco

Clayco has recently started construction on PALMtower, a 28-story residential tower located in downtown Phoenix at 440 East Van Buren Street. Will Bruder Architects designed the building in collaboration with LJC.

The 481,980-sf building will comprise 352 apartment units and six floors of above ground parking with 370 spaces and 120 spots for bike parking. A 17,500-sf seventh floor amenity level includes an outdoor pool and an indoor-outdoor common space. The exterior cladding will be comprised of glass and metal paneling meant to showcase true urban living with a unique and high-end facade.

In addition to Will Bruder Architects, LJC, and Clayco, the build team also includes American Development Group (developer), Dibble (civil engineering), BASE (structural engineering), and Peterson Associates (MEPFP). The project is slated for completion in early 2024.

Related Stories

Multifamily Housing | Nov 14, 2019

U.S. multifamily market stays strong into 4th quarter 2019

October performance sets a record amid rising political pressure to cap rent growth, reports Yardi Matrix. 

Multifamily Housing | Nov 7, 2019

Multifamily construction market remains strong heading into 2020

Fewer than one in 10 AEC firms doing multifamily work reported a decrease in proposal activity in Q3 2019, according to a PSMJ report.

| Nov 6, 2019

Solomon Cordwell Buenz opens Seattle office, headed by Nolan Sit

National design firm brings residential high-rise expertise to the Pacific Northwest

| Nov 6, 2019

Passive House senior high-rise uses structural thermal breaks to insulate steel penetrations

Built to International Passive House standards, the Corona Senior Residence in Queens, N.Y., prevents thermal bridging between interior and exterior steel structures by insulating canopies and rooftop supports where they penetrate the building envelope.

Multifamily Housing | Nov 5, 2019

The Collective Paper Factory is the co-living company’s first U.S. location

The building offers a stay model ranging from one night to 29 days.

Multifamily Housing | Nov 4, 2019

A historic ice cream factory now provides Milwaukee with affordable housing

Thanks to projects like this, the Lindsay Heights neighborhood is definitely on the upswing.

Multifamily Housing | Oct 31, 2019

Soltra at SanTan Village breaks ground in Arizona

Todd & Associates designed the project.

| Oct 30, 2019

James McHugh Construction breaks ground on 1000M, Michigan Avenue’s tallest tower to be

McHugh will start work on the 832-foot-tall residential 1000M tower in December 2019.

| Oct 30, 2019

The Beach Company acquires land for multifamily community in Chattanooga

River Rock project will add 163 apartments near the Tennessee River in Chattanooga’s downtown riverfront district.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021