Associated Builders and Contractors (ABC) released its Construction Backlog Indicator (CBI) for the first quarter of 2012. CBI declined 5.4% from the previous quarter, dipping from 7.8 months to 7.4 months, but is slightly higher compared to the first quarter of 2011.
“On the heels of a mixed bag of national economic news, CBI declined for the second quarter in a row,” said ABC Chief Economist Anirban Basu. “The lull in nonresidential construction momentum is not poised to end in the immediate term. The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
“The ongoing instability in the nation’s nonresidential construction industry appears to be related to the period of economic weakness that developed in the broader economy last year, as well as concerns regarding export growth due to recessionary forces in Europe,” Basu said. “The result is that many prospective construction projects were cancelled or postponed.”
Regional highlights
- Compared to the first quarter of 2011, construction backlog is slightly higher in every region with the exception of the Northeast.
- In the West, construction backlog expanded by 0.46 months from the fourth quarter of 2011 to the first quarter of this year.
- The Middle States have the shortest backlog at 6.34 months and the South continues to register the lengthiest backlog at 8.88 months.
Analysis
“The South, which includes a number of rapidly expanding, commodity rich states, continues to be the top performer in terms of producing new opportunities for contractors,” said Basu. “Though average construction backlog in the South was roughly flat during the past quarter, backlog is up by seven-tenths of a month from one year ago. No other region has generated an increase in backlog that large.
“Construction backlog expansion in the Middle States continues to be stifled,” Basu said. “Gains in industrial production have been sporadic during the past year – too scattered to induce the next wave of manufacturing-related construction projects. In addition, average construction backlog in the Northeast has fallen on a year-over-year basis. Last year’s soft patch, including the economic weakness associated with the debt ceiling issue, appears to have impacted the financial institution-rich Northeast more than other region.” +
Related Stories
| Nov 11, 2012
Under40 Leadership Summit draws 71 young leaders to Chicago
More than 70 young—that is, under age 40—architects, engineers, and construction professionals descended on Chicago in early October with one thought in mind: to learn how to “create with clarity.”
| Nov 11, 2012
AIA: Building Envelope
Preventing and treating failure in glazed curtain wall systems. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Nov 11, 2012
Greenbuild 2012 Report: Hospitality
Hotel boom signals good news for greener lodging facilities
| Nov 11, 2012
Greenbuild 2012 Report: Government & Military
Public sector remains a bastion of sustainability
| Nov 11, 2012
Greenbuild 2012 Report: Healthcare
Green medical facilities extend beyond hospital walls
| Nov 11, 2012
Greenbuild 2012 Report: Multifamily
Sustainably designed apartments are apples of developers’ eyes
| Nov 11, 2012
Greenbuild 2012 Report: Higher Education
More and more colleges and universities see sustainainably designed buildings as a given
| Nov 11, 2012
Greenbuild 2012 Report: K-12
High-performance schools put ‘sustainability’ in the lesson plan
| Nov 7, 2012
John Portman & Associates awarded new high rise in China
108-story building to rise in Nanning, the Capital City of Guangxi Province.