flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction backlog declines 5.4% in the first quarter of 2012?

Construction backlog declines 5.4% in the first quarter of 2012?

The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.


By Posted by Tim Gregorski, Senior Editor | May 24, 2012
ABC Chief Economist Anirban Basu
ABC Chief Economist Anirban Basu

Associated Builders and Contractors (ABC) released its Construction Backlog Indicator (CBI) for the first quarter of 2012. CBI declined 5.4% from the previous quarter, dipping from 7.8 months to 7.4 months, but is slightly higher compared to the first quarter of 2011.

“On the heels of a mixed bag of national economic news, CBI declined for the second quarter in a row,” said ABC Chief Economist Anirban Basu. “The lull in nonresidential construction momentum is not poised to end in the immediate term. The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.

“The ongoing instability in the nation’s nonresidential construction industry appears to be related to the period of economic weakness that developed in the broader economy last year, as well as concerns regarding export growth due to recessionary forces in Europe,” Basu said. “The result is that many prospective construction projects were cancelled or postponed.”

Regional highlights

  • Compared to the first quarter of 2011, construction backlog is slightly higher in every region with the exception of the Northeast.
  • In the West, construction backlog expanded by 0.46 months from the fourth quarter of 2011 to the first quarter of this year.
  • The Middle States have the shortest backlog at 6.34 months and the South continues to register the lengthiest backlog at 8.88 months.

Analysis
“The South, which includes a number of rapidly expanding, commodity rich states, continues to be the top performer in terms of producing new opportunities for contractors,” said Basu. “Though average construction backlog in the South was roughly flat during the past quarter, backlog is up by seven-tenths of a month from one year ago. No other region has generated an increase in backlog that large. 

“Construction backlog expansion in the Middle States continues to be stifled,” Basu said. “Gains in industrial production have been sporadic during the past year – too scattered to induce the next wave of manufacturing-related construction projects. In addition, average construction backlog in the Northeast has fallen on a year-over-year basis. Last year’s soft patch, including the economic weakness associated with the debt ceiling issue, appears to have impacted the financial institution-rich Northeast more than other region.” +

Related Stories

| Jun 24, 2014

From Babylon to Sydney: The evolution of the modern workspace [infographic]

This infographic, made by Sunica de Klerk and originally posted by ArchDaily, shows the evolution of the office from 2400 B.C. to the present day.

| Jun 24, 2014

Mayor Rahm Emanuel announces plans for a Chicago Architecture Biennial

Chicago's mayor Rahm Emanuel announces plan to hold the Chicago Architecture Biennial in late 2015, intended to rival Venice's Biennale.

| Jun 24, 2014

Intuit begins work on LEED Platinum campus addition

Demolition will begin this week as a precursor to construction of Intuit's new addition to its Mountain View, Calif., campus. The first of two additions, a 185,000-sf building on Marine Way, is expected to begin construction in August. 

| Jun 23, 2014

5 new designs unveiled for Make It Right homes at Fort Peck, Mont.

Make It Right, Brad Pitt's foundation that builds homes for people in need, has just revealed five new designs for the Fort Peck (Mont.) Indian Reservation.

| Jun 23, 2014

Gehry's 'glass sail' cultural center for Foundation Louis Vuitton set to open in October

Comissioned by Bernard Arnault, American legendary architect Frank Gehry's newest structure in Paris for Foundation Louis Vuitton will house eleven galleries and an auditorium for performing arts.

| Jun 23, 2014

Power of IPD: Is integrated project delivery truly a transformative delivery model?

Now that many of the first-generation IPD projects have been completed, CBRE Healthcare's Tim McCurley and Stephen Powell ponder the lessons learned and pros and cons of the industry's newest delivery model. 

| Jun 23, 2014

Lilker Associates launches Lighting Group; David Cyr announced as Director

New division rounds out building systems services offerings for the Manhattan-based consulting firm.

| Jun 23, 2014

Berlin House of One will accommodate Muslims, Jews, and Christians

The building will rise on the ruins of a 13th-century Christian church that was damaged during WWII and eventually demolished.

| Jun 22, 2014

5 ways to improve your firm’s branding efforts

Establishing, conveying, and maintaining a powerful brand is a critical component of an AEC firm’s marketing strategy. Here are five strategies to make a greater impact with your firm’s branding efforts.

Sponsored | | Jun 22, 2014

JW Marriott Indianapolis redefines city’s skyline

The 34-story JW Marriott is both the largest and tallest hotel in Indianapolis. One of the most prestigious hotels in the city, the JW Marriott has hosted celebrities and NFL teams alike. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021