flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health


By By BD+C Staff | October 12, 2011
Due to be completed in November of 2012, the $11.4 million Bigelow Center for Ocean Health (COH) will be one of three complement

 

Consigli Construction Co. Inc. announces that its Portland, Maine office has broken ground in East Boothbay, Maine on the third building at the new 64-acre Ocean Science and Education campus they are constructing for Bigelow Laboratory for Ocean Sciences.

Due to be completed in November of 2012, the $11.4 million Bigelow Center for Ocean Health (COH) will be one of three complementary and interconnected research centers on the campus built by Consigli Construction and designed by WBRC Architects · Engineers in association with Perkins + Will. Bigelow Laboratory received major funding for the COH from a federal construction grant awarded through the National Institute for Standards and Technology in September 2010.

The COH joins the Bigelow Center for Blue Biotechnology, which will be occupied this December, and the Center for Ocean Biogeochemistry and Climate Change, slated for completion in spring 2012.  The newest facility will house a 16,600 square-foot main building, augmented by a 1,200 square-foot shore facility, with seawater pumping facilities and pier and dock space for research vessels to support field research and SCUBA operations.

“The COH will bring scientists together in a unified facility, where we can develop a multi-disciplinary, multi-scale approach to ocean health that will provide improved management tools to support healthy, productive and resilient ocean ecosystems,” said Laboratory Executive Director, Dr. Graham Shimmield.

When fully completed, the Ocean Science and Education campus will provide over 60,000-sf of laboratory, education and administrative space; replacing the Laboratory’s leased facilities in West Boothbay Harbor. BD+C

Related Stories

Building Team Awards | Apr 9, 2015

Multifaced fitness center becomes campus landmark

A sloped running track and open-concept design put this Building Team to the test. 

Building Team Awards | Apr 9, 2015

Nation's first LEED-certified bus depot

A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.

Building Team Awards | Apr 9, 2015

Setting the bar for port-of-entry design

Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.

Building Team Awards | Apr 9, 2015

Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C

Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Cultural Facilities | Apr 7, 2015

Mies’ Martin Luther King Jr. Library to get makeover

The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”

Cultural Facilities | Apr 6, 2015

Berkeley’s West Branch Library generates more energy than it uses

The 9,400-sf facility is California's first Net Zero Energy-certified building.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021