flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Consigli complete first building for Bigelow Ocean Sciences Campus

Consigli complete first building for Bigelow Ocean Sciences Campus

Designed by WBRC Architects Engineers in association with Perkins + Will.


By By BD+C Staff | February 27, 2012
The 25,600-sf three-story building, which houses the worlds first microbial sin
The 25,600-sf three-story building, which houses the worlds first microbial single cell genomics center and the largest collect

Consigli Construction Co., Inc. has completed construction of the Bigelow Center for Blue Biotechnology (BCBB), the first building at the new Bigelow Laboratory for Ocean Sciences campus in East Boothbay.

The new $10.3 million BCBB is one of three complementary and interconnected research centers that Consigli, along with WBRC Architects Engineers, in association with Perkins + Will, planning and design architect, are completing at the 64-acre Ocean Science and Education Campus.

The 25,600-sf three-story building, which houses the world’s first microbial single cell genomics center and the largest collection in the world of marine phytoplankton, contains various laboratories, offices, a café and conference space. Research in the BCBB focuses on harnessing the potential of the ocean’s microbial life to benefit society through new technologies and product development. Projected to receive LEED Gold designation, the BCBB’s energy-efficient design includes interior and exterior building materials chosen for their low carbon footprint, high use of recycled content, sustainable manufacturing process and lifecycle durability. BD+C

Related Stories

| Mar 21, 2012

10 common data center surprises

Technologies and best practices provide path for better preparation.

| Mar 21, 2012

ABI remains positive for fourth straight month

Highest spike in inquiries for new projects since 2007.

| Mar 21, 2012

Iowa’s Mercy Medical Center’s new Emergency Department constructed using Lean design

New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2 trauma treatment rooms. 

| Mar 21, 2012

Clary, Hendrickson named regional directors for HDR Architecture

New directors will be responsible for expanding and strengthening the firm throughout the central region. 

| Mar 20, 2012

FMI releases 2012 first quarter construction outlook

The last time construction put in place was at this level was 2000-2001.

| Mar 20, 2012

Ceco Building Systems names Romans marketing director

Romans joins Ceco Building Systems with over 15 years in marketing and customer service.

| Mar 20, 2012

UT Arlington launches David Dillon Center for Texas Architecture

Symposium about Texas architecture planned for April.

| Mar 20, 2012

Stanford’s Knight Management Center Awarded LEED Platinum

The 360,000-sf facility underscores what is taught in many of the school’s electives such as Environmental Entrepreneurship and Environmental Science for Managers and Policy Makers, as well as in core classes covering sustainability across the functions of business.

| Mar 20, 2012

New office designs at San Diego’s Sunroad Corporate Center

Traditional office space being transformed into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.

| Mar 19, 2012

Obama’s positioned to out-regulate Bush in second term

Proposed ozone rule would cost $19 billion to $90 billion in 2020, according to the White House.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021