flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

The design by EskewDumezRipple emphasizes daylighting and energy efficiency and draws inspiration from the Connecticut coast’s rock quarries.


By Novid Parsi, Contributing Editor  | June 20, 2024
Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition Photo: Tim Hursley
Photo: Tim Hursley

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size.

Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 

The project provides permanent and changing galleries, expanded collection storage, education spaces, public gathering places, and a public entrance lobby. A new lecture hall serves as a hub for community programming, public lectures, and receptions. 

“We can host the community in a way we’ve never been able to before,” Robert Wolterstorff, executive director, Bruce Museum, said in a statement. “In the past, we had no permanent collections galleries.”

The project reorients the museum’s entrance so that, instead of facing a highway, it now faces the free and public Bruce Park. The double-height lobby, café, and gift shop form an open, free-flowing public area, and a new courtyard joins the existing museum to the addition. 

EskewDumezRipple’s design draws inspiration from both the historic stone house and the surrounding region’s geology. The striated façade of cast stone and glass evokes the Connecticut coast’s rock quarries, and the façade changes appearance as the sun changes position depending on the time of day and year. The design emphasizes natural daylighting, with openings in the façade providing light to the interior that gradually recedes deeper in the galleries.

The energy-efficient design includes an airtight façade, highly efficient air-handling units, a dehumidification system, and a stormwater management system that collects 100% of rainwater onsite. The museum has a predicted Energy Use Intensity (EUI), or the amount of energy used per square foot annually, of 63, in contrast to an EUI of 186 for similar museums in the northeast US, according to the statement.

On the Building Team:
Owner: Bruce Museum
Owner’s representative: Stone Harbor Land Company
Architecture and interiors: EskewDumezRipple
Contractor: Turner Construction
Landscape architect: Reed Hilderbrand
Structural engineering: Guy Nordenson and Associates 
MEP engineering: Altieri 
Civil engineering: Redniss & Mead
Geotechnical: Melick-Tully and Associates
Lighting: Fisher Marantz Stone
Acoustics and A/V: Jaffe Holden
Envelope: Simpson Gumpertz & Heger

Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley
Photo: Tim Hursley

Related Stories

| Jul 26, 2013

How biomimicry inspired the design of the San Francisco Museum at the Mint

When the city was founded in the 19th century, the San Francisco Bay’s edge and marshland area were just a few hundred feet from where the historic Old Mint building sits today. HOK's design team suggested a design idea that incorporates lessons from the local biome while creating new ways to collect and store water.

| Jul 22, 2013

Cultural Facility Report [2013 Giants 300 Report]

Building Design+Construction's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2013 Giants 300 Report.

| Jul 19, 2013

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 2, 2013

LEED v4 gets green light, will launch this fall

The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.

| Jul 1, 2013

Report: Global construction market to reach $15 trillion by 2025

A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.

| Jun 28, 2013

Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report

A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals. 

| Jun 25, 2013

Mirvish, Gehry revise plans for triad of Toronto towers

A trio of mixed-use towers planned for an urban redevelopment project in Toronto has been redesigned by planners David Mirvish and Frank Gehry. The plan was announced last October but has recently been substantially revised.

| Jun 25, 2013

DC commission approves Gehry's redesign for Eisenhower memorial

Frank Gehry's updated for a new Dwight D. Eisenhower memorial in Washington, D.C., has been approved by the Eisenhower Memorial Commission, reports the Washington Post. The commission voted unanimously to approve the $110 million project, which has been gestating for 14 years.

boombox1
boombox2
native1

More In Category



Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021