In the midst of political and economic uncertainty, U.S. engineering firm leaders expressed newfound optimism in the current status and future potential of primary markets, according to the latest Engineering Business Index (EBI), just released by the American Council of Engineering Companies (ACEC).
The 3rd Quarter 2016 (Q3/2016) EBI was 61.4, up 1.2 points from the Q2/2016 score of 60.2—which was the lowest score since ACEC launched the EBI in January 2014.
EBI is a diffusion index that charts the health of the engineering industry by consolidating senior leadership responses on market and firm performance into a single composite score. Any number above 50 indicates expansion. The Q3/2016 survey of 326 engineering firm leaders was conducted September 15 to October 5.
Market expectations for one year from today among engineering firm leaders rose a healthy 6.2 points to 63.3—the largest quarter-to-quarter increase since the EBI’s inception. The increased optimism for one year from today was reflected in nine of the 11 surveyed market sectors—a drastic turnaround from the Q2/2016 survey, when engineering leaders expected only one of the 11 sectors—energy and power—to improve over the coming year.
Among public markets, transportation was the strongest sector, up 2.1 points to 64.2. Other rising sectors include water/wastewater (up 0.9, to 63.0); healthcare construction (up 0.8, to 55.8), and education facilities (up 3.0, to 55.0).
Only the environmental sector fell, dropping 0.8 points to 54.3. Among private markets, firm leaders were most bullish about the buildings sector, up 4.4 points to 62.9, followed by energy and power (up 0.7, to 60.4), land development (up 1.2, to 60.2), and Industrial/Manufacturing (up 2.8, to 58.2).
For the complete summary of ACEC’s Q3/2016 Engineering Business Index (EBI), go to www.acec.org.
Related Stories
| Aug 14, 2013
Warehouses go vertical in NAIOP distribution/fulfillment center design competition
NAIOP, the Commercial Real Estate Development Association, has selected Ware Malcomb, a contemporary full-service architectural design firm headquartered in Irvine, California, and Riddell Kurczaba, a design consulting firm located in Calgary and Edmonton, Alberta, Canada, as winners of the 2013 Distribution/Fulfillment Center Design of the Future.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Aug 14, 2013
Military Construction Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest military sector design and construction firms, as reported in the 2013 Giants 300 Report.
| Aug 13, 2013
DPR's Phoenix office, designed by SmithGroupJJR, affirmed as world's largest ILFI-certified net-zero facility
The new Phoenix Regional Office of DPR Construction, designed by SmithGroupJJR, has been officially certified as a Net Zero Energy Building by the International Living Future Institute (ILFI). It’s the largest building in the world to achieve Net Zero Energy Building Certification through the Institute to date.
| Aug 13, 2013
USGBC joins forces with Green Sports Alliance to promote sustainable venues
The U.S. Green Building Council (USGBC) has announced a collaboration with the Green Sports Alliance, a prominent nonprofit organization supporting the development and promotion of green building initiatives in professional and collegiate sports.
| Aug 13, 2013
Thornton Tomasetti announces multiple promotions
The Thornton Tomasetti board of directors and managing principals announce the promotions of Michael J. Squarzini, Lance Parker, and Aaron Beebe.
| Aug 13, 2013
Michael Thomas joins ESD
Mike Thomas has been named Vice President and Business Development Director at ESD (Environmental Systems Design, Inc.), an international leader in the consulting-engineering design of high performance building systems.
| Aug 12, 2013
Decade-long renovation of Kansas Capitol Building expected to be complete by year end
A $300 million-plus, decade-long renovation of the Kansas Capitol Building in Topeka is expected to be complete by the end of the year. The exterior refurbishing of copper over the four imposing wings and around the dome should be complete by late November.
| Aug 12, 2013
New York’s first net-zero school will be a sustainability lab for city school system
An elementary school on Staten Island will be the first net-zero energy school in New York City and the Northeast. The school is designed to use half the energy of a typical New York public school. Construction will be completed in 2015.