The potential for a mega-earthquake in the Cascadia Subduction Zone is high, according to scientists, and that has provoked debate over the seismic resilience of Oregon schools.
Parents have concerns about the safety of the buildings in a major earthquake, and advocates for more resilient buildings also point out that schools are well suited for the role of disaster shelters if they are strong enough to withstand temblors. Schools tend to be evenly distributed throughout neighborhoods, and they often have large, open spaces like cafeterias and gymnasiums that easily can be converted to sleeping areas.
The school district in Beaverton, Ore., is using a $680 million bond to design its new schools to double as emergency shelters and be functional shortly after an earthquake. Its new $98 million high school is designed with an emergency generator, and plumbing and electric wiring constructed with emergency services in mind. These features cost the district $900,000.
A structural engineer that wrote a paper on Beaverton’s resilient school designs says that communities should have conversations about school resilience before putting bond measures to vote.
Related Stories
Codes and Standards | May 25, 2017
Better Buildings Challenge Partners on track to reduce energy usage by 20% in 10 years
More than 1,000 proven solutions are now available on DOE web site.
Codes and Standards | May 22, 2017
Affordable housing initiative drives surge in residential unit permits in New York City
New permits tripled from year-ago period.
Codes and Standards | May 22, 2017
Amid labor shortage, industry groups urge government action to boost trades
AGC says a shortage of qualified workers is limiting the economy from adding more jobs.
Codes and Standards | May 19, 2017
Spate of sinkhole incidents points to neglected infrastructure investment
Suddenly appearing caverns cause deaths, evacuations, interruption of utility services.
Codes and Standards | May 18, 2017
AIA releases updated edition of its A201 flagship documents
These core documents are updated once a decade.
Codes and Standards | May 16, 2017
Trump’s proposed corporate tax rate changes said to stifle funding for affordable housing
Banks reluctant to commit to specific deals with tax credit status uncertain.
Codes and Standards | May 15, 2017
New IoT-Ready Alliance to establish standard for IoT sensors in LED light fixtures
It aims to make installation of technology easier.
Codes and Standards | May 10, 2017
OSHA increases penalties on South Dakota contractor after fatal building collapse
Agency issues over $300,000 in fines for ‘willful’ safety violations.
Codes and Standards | May 9, 2017
Potential shade on Boston Common from proposed high-rise raises public ire
The Mayor is among those who want to change 1990s anti-shadow law.
Codes and Standards | May 9, 2017
Method of estimating amount of CO2 by building occupants may be inaccurate
New research suggests current estimates may be off by as much as 25%.